9.4 KiB
Weekly Plan
Weekly Plan — Week of 2026-06-01
Top Priority: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — DRI on the parent ship with 4 subtasks already overdue, ship review still uncommented, hard deadline Fri 6/5 the day before partial WWDC AFK starts.
Note on inputs: No weekly review file exists at /Users/admin/obsidian/work/briefs/weekly/2026-05-29.md (eod and weekly dirs were empty). This plan is built directly from the Asana snapshot + career-notes + recurring-rhythms. Flagging the gap so a weekly review can be backfilled at end-of-week.
Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 70% | Ship Review prep + 4 overdue onboarding subtasks; Fri deadline before WWDC partial AFK 6/8–12. Up from 60% target — explicit tradeoff against Career/Strategy this week. |
| AOR | 10% | Light week: only one open AOR PR (Monterrey-only) and quick-action overdue cleanup. |
| Career | 15% | Dominik OOO entire week (1:1 skipped) — convert that slot to Project Advisor readiness doc, since EP3 cycle is ~8 weeks out. |
| Strategy | 5% | Engage with Windows AOT delivery-plan thread (already drafted Sat reply; needs follow-up Mon). |
Shape
Mon (today): Close fast-merge onboarding PRs + tee up Ship Review
- Hide Free plan • Upgrade in onboarding [0.5d] — PR #5149 ✅ CI ✅ review → merge
- Hide "stop chat" button in the input box [0.5d] — PR #5173 ✅ CI ✅ review → merge
- Ship AI onboarding winner (Treatment B) [0.5d] — PR #5145 🔴 CI failing → diagnose + fix
- O-L Weekly Meeting (recurring, 6/1)
Tue: Persist + Try Visiting work + Apple Weekly demo prep
- Persist 'You've got this' dialogue in non-focused state [2d] — due today; first half of 2d estimate
- Try Visiting a Site: Background [1d] — was due 6/1, slip to Tue
- Apple Weekly Team Meeting (recurring, 6/2)
- Reply to Mark on Windows AOT delivery plan thread (Strategy)
Wed: Animated assets + parent ship task progress
- Address Bar Toggle Selection: Animated Assets [2-3d] — due Thu 6/4, start now
- iOS Address onboarding conflicts with unified input... — push parent toward ship-ready
- O-N Weekly Meeting (recurring, 6/3)
Thu: Ship Review submission day
- Ship Review: iOS Address onboarding conflicts... — populate, request reviewers
- Close remaining animated-asset work
- Career: 30-min block — draft Part 1 of Project Advisor Readiness doc (Readiness Self-Reflection)
Fri: Lock-in + weekly review + WWDC handoff
- Final SR sign-off chase on iOS Address onboarding parent (due today)
- Write weekly review for 2026-06-05 (backfill: include 5/29 + this week)
- Handoff notes for partial WWDC AFK 6/8–12 — flag any open subtasks, name interim DRI if needed
- (No 1:1 — Dominik OOO 6/1–6/5)
Must-Not-Forget
-
Persist 'You've got this' dialogue in non-focused state [2d] — assignee: Alex due 2026-06-01 (today) — Alex is DRI; sized at 2d so already at risk of slipping into Wed even if started today.
-
Try Visiting a Site: Background [1d] — assignee: Alex due 2026-06-01 (today) — Alex is DRI on an onboarding subtask feeding the Fri 6/5 ship; do not let this drift past Tue.
-
Ship AI onboarding winner (Treatment B) [0.5d] — assignee: Alex due 2026-05-28 (4d overdue) — PR #5145 has 🔴 CI. Alex is DRI; failing CI = Alex is the blocker, not waiting on review.
-
Address Bar Toggle Selection: Animated Assets [2-3d] — assignee: Alex due 2026-06-04 — 2–3d estimate means start by Wed at latest or the Fri 6/5 parent ship slips.
-
iOS Address onboarding conflicts with unified input and ship AI onboarding winner — assignee: Alex due 2026-06-05 — Parent ship; this is the TP. Subtasks must close in time to leave Thu for Ship Review.
AOR Quick Wins This Week
-
Desktop Browser Feature Owner Survey [anonymous, 5 minute timebox] overdue 6 days — 5-minute anonymous survey. Knock out before Tue.
-
Pinned tab opens link in background tab overdue 31 days — Internal Product Feedback bug; triage decision + assign or fix-tag.
-
Text selection in the address bar doesn't work as standard overdue 31 days — Internal Product Feedback bug; same — triage and route.
-
PR: Make our macOS app Monterrey-only - 1-3d (apple-browsers) overdue 5 days — Alex's PR; verify status (likely ready to land, see Diego's 5/30 note that Monterey+ merges this week).
Sprint Backlog (pick 1–2 if time allows)
-
PR Check failing on main — testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain... due 2026-04-22 (40d overdue) — CI failing test; in
activesection. -
PR Check is failing on main due 2026-05-15 (17d overdue) — CI failing test; check whether Sam S's overnight-stable PR (per 5/31 comment on the now-closed sibling) covers this too.
-
Review Overdue Tasks Summary - 22 Tasks (Jan 2026) due 2026-01-27 (125d overdue) — Inbox cleanup pass; defer to post-WWDC unless room appears.
(+ 3 aged items >180 days in backlog — not listed)
On Radar
-
TD/discussion: Sorting in big HTML is 15sec vs Vivaldi 2sec — Ivy flagged DOM performance test framework angle. Performance is adjacent to macOS browser core but no direct ask of Alex; monitor.
-
TD/discussion: Windows Browser: Re-enable isolated JS worlds — Bulcsu commented on flag-passing approach. Touches Windows AOT plan Alex authored; monitor; engage if scope creeps.
-
TD/discussion: Desktop Browsers: Design - Simplify Fire Button — Peter + Mark aligning on feature-flag rollout sequencing. Mac UI work in Alex's wheelhouse; monitor.
Career Action This Week
Draft Part 1 of Project Advisor Readiness Self-Reflection (30 min, Thu).
Picked because: (1) Dominik OOO entire week → 1:1 prep N/A; (2) Project Advisor is the #1 EP3 lever per career-notes and is Not started; (3) Christie calibration follow-up not actionable without Dominik; (4) no active O-N/O-L Assessment surfaced in DB right now needing a comment. Other items skipped for those reasons.
On Radar / Participation Needed
- Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build Alex pushed back on Fri/Sat ("don't get why a different DRI is spun off without discussing"), Ivy + Mark responded Sat clarifying scope. Alex has not yet replied — engage Tue to close the loop before this drifts.
Carried Forward from Last Week
-
Ship AI onboarding winner (Treatment B) [0.5d] — Alex → see TP section above (PR #5145 CI failing)
-
Hide Free plan • Upgrade in onboarding [0.5d] — Alex → see TP section above (PR #5149 ready to merge)
-
Hide "stop chat" button in the input box [0.5d] — Alex → see TP section above (PR #5173 ready to merge)
-
PR: Make our macOS app Monterrey-only - 1-3d — Alex PR open, 5 days overdue. Diego's 5/30 note confirms Monterey+ branch merges this week; sync with him then close.
-
Follow-up: add support of Inline Text Images to TypingTextAnimation — Alex PR #4663 open as draft (CI ✅, review ⏳). Was due 5/28; un-draft and request review post-ship.
-
PR: C-S-S Fix site copy/cut/paste/text selection restrictions — delegated, assignee unknown Stale 76d, no GitHub match found (per delegated PR correlation in snapshot). Verify owner + state.
-
Dominik :: Alex Regular 1:1 Agenda — Alex Due 5/26 was last cycle's; Dominik OOO this entire week → no 1:1 to prep. Add the Project Advisor doc result + EP3 gap question for the next 1:1 (likely week of 6/15+).
Based on Asana snapshot 2026-06-01 07:31 UTC + career-notes + recurring-rhythms. No weekly-review file found for 2026-05-29 — flagged above. Plan generated 2026-06-01 ~13:35 local.