Files
obsidian-vault/work/briefs/daily/2026-05-29.md
T

7.9 KiB
Raw Blame History


Daily Brief — 2026-05-29 (Friday)

Morning

On May 29, 1953, Edmund Hillary and Tenzing Norgay became the first humans to stand on top of Everest. The famous summit photo only exists because Hillary, on the way down, remembered to snap one of Tenzing — he himself had never been taught to use the camera, so there's no shot of Hillary up there. 🌿 Step outside for 5 minutes before opening Slack.

No weekly plan found at briefs/weekly/plan-2026-05-25.md — brief derived from DB state and the 2026-05-29 inbox-triage carry-over only. Today's anchor: ship the iOS Duck.ai onboarding TP cluster. New signals since yesterday: 17 task changes, 17 new comments — most concentrated on the Ship-AI-onboarding-winner thread (Alessandro raised a mid-experiment shipping concern overnight that needs your call).

Plan for Today

  1. Complete the Desktop Browser Feature Owner Survey — anonymous, 5-min timebox, 3 days overdue. Momentum starter.
  2. 🔴 Ship AI onboarding winner (Treatment B) — TP, due yesterday. Reply to Alessandro's option-1-vs-2 question and ack Costas on iPhone-only.
  3. 🔴 Hide Free plan • Upgrade in onboarding — TP, due yesterday. PR #5149 has CI and review — merge and confirm shipped.
  4. 🟠 Hide "stop chat" button in input box — TP, due today (0.5d).
  5. 🟠 Persist 'You've got this' dialogue in non-focused state — TP, due today (0.5d).
  6. 🟠 Engage on DRI <> Project Advisor async for Demo tracker blocking — Alessandro spun this up Thu 23:30 because you were OOO; respond to kick it off.
  7. 🟡 Batch the 11 GitHub review requests + mentions after the TP block.

🔴 Urgent / Overdue

[NEEDS ACTION] [DRI] — Ship AI onboarding winner (Treatment B)top_priority, due 2026-05-28

  • Context: Two fresh comments today. Alessandro flagged that shipping Treatment B mid-experiment could compromise the tracker-blocker demo data and proposed two paths (option 1 = wait for min sample size, then remote-config swap; option 2 = halt + restart). Costas confirmed iPhone-only for now and wants to discuss iPad copy in next O-N weekly.
  • Action: Reply on Alessandro's thread picking option 1 or 2; ack Costas on iPhone-only + park iPad copy for Wed's O-N weekly.

[NEEDS ACTION] [DRI] — Hide Free plan • Upgrade in onboardingtop_priority, due 2026-05-28

  • Context: PR #5149 has CI and review . Last sub-task standing on PR side.
  • Action: Merge, confirm shipped, close the Asana task.

[NEEDS ACTION] [DRI] — Desktop Browser Feature Owner Surveyinbox, due 2026-05-26 (3d overdue)

  • Context: Anonymous, 5-minute timebox.
  • Action: Fill it in and close.

[STALLED] [DRI] — PR: Make our macOS app Monterrey-onlyinbox, due 2026-05-27 (2d overdue)

  • Context: Placeholder PR task, no activity since the 27th.
  • Action: Either start the PR, defer with a new date, or close.

[NEEDS ACTION] [AUTHOR] — Follow-up: add support of Inline Text Images to TypingTextAnimationinbox, due 2026-05-28 (1d overdue)

  • Context: Draft PR #4663 is up (CI ). Currently sitting in draft — no reviewer requested.
  • Action: Un-draft and request review, or post a "blocked on X" note.

Backlog cluster (informational — not actionable today) Old inbox/active/planning items with stale dates and no recent comments. Worth a 30-min triage block this week:

  • Bug: Tab preview stuck around (inbox, due Apr-2025)
  • Duo Grafana login persistence (inbox, due Jul-2025)
  • Assertion Failure Pixel Anomaly Sep-2025 (planning, due Sep-2025)
  • Review Overdue Tasks Summary — 22 Tasks Jan 2026 (planning, due Jan-2026)
  • PR Check failing on main × 2 (active/inbox, due Apr/May)
  • Pinned tab opens link in background tab (inbox, due May-1)
  • Text selection in address bar doesn't work as standard (inbox, due May-1)

🟠 Needs Action Today

Ship Reviews (DRI)

Tech Designs / PFRs / Incidents

  • None requiring action — Discord-incident postmortem closed yesterday (14:50) with action items captured in tasks 1215193471130270 (GDPR follow-up Jun-15), 1214799615211686 (bot API access), 1213887605570357 (containerization env).

Other inbox requiring decision today

PR Reviews — batch after TP block 11 review-requests / mentions queued on GitHub (privacy-configuration rollouts: nativeStorage 100%, ad-blocking soft launch, iPad toggle iOS 7.211; apple-browsers: value-transformer observability, debugDescription force-unwrap fix, Maestro tests, Final dialog for Duck.ai flow, subscription sheet NTP flash, filterAddressBarUpdates removal, voice-chat-from-app-open part 1, Favicons CoreData crash). Full list in asana_context.md — surface as one batch, not individually.


🟡 Delegated — Follow Up Needed

Overdue

Stale > 5d

Fresh (monitor only)


🔵 Rhythms

TP: iOS Duck.ai Onboarding cluster (O-N Growth) — actively shipping. Two sub-items overdue from yesterday (the two "ship AI onboarding winner" + "hide Free plan" PRs), two due today, one ON HOLD pending experiment data. Not stale — moving daily. No Next-TP-Thread needed yet (current TP isn't close to release; Ship Review still pending reviewers).

Active rotation: None.

Upcoming this week (no action today)

  • Mon 6/1 — O-L Weekly Meeting.
  • Tue 6/2 — Apple Weekly Team Meeting.
  • Wed 6/3 — O-N Weekly Meeting — good slot to raise the iPad-onboarding copy question Costas surfaced today.
  • Jun 812 — Partly AFK (WWDC'26), 10 days out — outside 7d window but worth pre-handover planning by mid-next-week.