Files
obsidian-vault/work/briefs/inbox/2026-04-09.md
T

3.3 KiB
Raw Blame History

I now have everything I need. Let me compile the triage.


Inbox Triage — 2026-04-09 (since 17:58)

Snapshot basis: Generated 2026-04-09 12:29 UTC. No new Asana activity in DB after the snapshot. All items below reflect today's changes captured in the snapshot.


New / Changed — Action Required


[OVERDUE] [DRI] — Remove or re-evaluate Warn Before Quit pixels Context: Due 2026-03-19 — 21 days overdue. An automated Asana reminder fired this morning: "This pixel is overdue for removal by 3 weeks, please prepare a PR. If you need more time, add a comment and adjust the due date as needed." Action: Prepare a PR to remove the pixel, OR add a comment explaining the delay and push the due date. Do not leave it silently past due again.


[OVERDUE] [DRI] — PR Check is failing on main - testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain_errorPageIsShownOnce Context: Due today (Apr 9). Sam assigned this to you yesterday (Apr 8) with the comment: "Looks like a flaky test here — from the failure I'm guessing it's due to the runner having an unreliable Internet connection. Any chance you can take a look?" No response from you yet. Action: Investigate the test failure. If confirmed flaky/network-related, disable or fix the test and respond to Sam.


[NEEDS ACTION] [DRI] — Ship-Review: [iOS] Introduce a new screen (Search or Duck.ai toggle) [2-3 days] Context: Due tomorrow (Apr 10). Three AOR comments landed today from Gary and Alessandro:

  • GJ13 (outstanding): Search dialogs still triggering on scroll when "You've got this!" screen is visible. Gary: "We're so close — just this one remaining."
  • AB1 (Alessandro): Control-cohort bug reproduced — something incorrect in the linear flow.
  • AB2 (Alessandro): New Tab is accessible during the "You've got this!" dialogue — should be disabled. GJ12, GJ14, SH1 were confirmed fixed. Alessandro has commented directly on the PR. Action: Confirm with the implementer that GJ13, AB1, and AB2 are being addressed today. If any are blocked or unacknowledged, follow up directly — the Ship Review is due tomorrow.

[NEEDS ACTION] [DELEGATOR] — macOS AppStore UI tests (delegated to Dominik) Context: Due tomorrow (Apr 10). SLA was auto-breached on Apr 7; Dominik reset the timeline to Apr 610 on Apr 8. Today's only change was an automated SLA countdown tick ("2d → 1d"). No completion or progress comment from Dominik. Action: Ping Dominik — "Are the macOS AppStore UI tests on track for tomorrow? Anything blocking you?"


New / Changed — Monitoring

[MONITORING] [DRI] — iOS: Demo tracker blocking after chat in onboarding (top_priority, due May 11) Context: Gary updated the date range today to Apr 14 May 11 and cross-referenced it in the "DRI <> Project Advisor async" task. No blockers raised. Start of active work pushed one week. Action: None — monitoring. Check in after Apr 14 if no update.


Rhythms

⚠️ 1-Must — Not set today. Two "What is your 1 Must today?" tasks were completed today (07:43 and 07:55 UTC), but neither has a comment from Alex identifying the committed task. Per the ritual, the 1-Must isn't formally set without that comment. No action now, but worth noting for tomorrow's morning routine.