1.8 KiB
Inbox Triage — 2026-04-06 (since 2026-04-06T09:53:12Z)
Triage window: 2026-04-06T09:53:12Z → ~2026-04-06T13:02Z (last workspace sync) Run type: Evening (18:00 complement)
New / Changed — Action Required
[NEEDS ACTION] [DRI] — What is your 1 Must today? Context: The 1-Must task for Apr 6 is open, due today, and has zero comments from you. The response template is blank. Task has not been closed. Action: Post your 1-Must response now, or close the task with a note on what you actually worked on today. Don't let it roll over unclosed.
New / Changed — Monitoring
[MONITORING] [DELEGATOR] — G14/ Dax talking image missing in contextual onboarding screens (assigned to Gary) Context: Task modified today (11:03Z) but no new comments. Last substantive exchange: you asked Apr 3 whether to drop the callout arrow; Gary answered Apr 4 — "remove the callout arrow, normal border like other dialogues; Dax follow-up in the next project." You reacted to his comment this morning (08:27Z). The modification is likely a metadata change. Action: None now. Gary's direction is clear. If this decision needs to be reflected in the parent Ship Review checklist, do that during your next Ship Review pass.
Nothing New
| Category | Result |
|---|---|
| New task assignments | None |
| New comments on my tasks | None |
| New comments on delegated tasks | None |
| Ship Review / TD updates | None detected |
| Incidents | None detected |
| Rotation changes | None detected |
Rhythms
| 1-Must (today) | ❌ Not set — task open, no comment recorded |
| TP / 1:1 | Not in triage scope — see daily brief |
Bottom line: Quiet inbox since this morning's sync. One flag: your 1-Must for today was never set or closed. Everything else is clean.