3.9 KiB
I now have everything I need. Here's the full triage:
Inbox Triage — 2026-04-10 (since 17:07)
New / Changed — Action Required
[NEW ASSIGNMENT] [DRI] — Error page: icon not updated, address bar not updated on error Context: Assigned to Alex at 17:33 (26 min ago). Inbox, no project, no due date. Only story is the assignment itself — no context yet. Action: Open task, read description, and classify: set due date, add notes, or move to appropriate section.
[OVERDUE] [DRI] — Design Review: Blinking Address Bar (due 2026-04-07, 3 days overdue) Context: Assigned to Alex in macOS Release Board. No stories fetched since Apr 6. No update or close visible. Action: Post a status update or mark complete if already resolved in a PR. Do not leave overdue without comment.
[OVERDUE] [DRI] — PR Check failing on main: testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain_errorPageIsShownOnce (due 2026-04-09) Context: Due yesterday. Automated overdue notice fired. Failing CI test on main branch. Action: Investigate CI failure. Fix, disable, or log as known flaky — then update the task accordingly.
[NEEDS ACTION] [DRI] — [macOS] GeolocationProviderTests async tests flakiness (due 2026-04-20) Context: Eduardo assigned to Alex today at 08:24 local — "flakiness from GeolocationProviderTests emerging again. I'll assign this to you as it seems you have already looked at it before." No acknowledgement from Alex yet. Action: Reply to Eduardo with initial read and plan: "Looking into it — will post findings."
[NEEDS ACTION] [DRI] — macOS Big Sur End Of Life: fix critical issues Context: Dominik commented at 12:35 local with explicit guidance — two tasks closed/descoped, two remain (one hard to reproduce rabbit hole, one unclear). Separately, an automated O-L Rubric prompt fired requesting: % of DAU, Frequency per DAU, Impact Evidence, and Cost Estimate fields. Action: (1) Close the tasks Dominik said to skip. (2) Fill the O-L Rubric fields in the project — check Grafana for DAU data.
[NEEDS ACTION] [DRI] — Remove or re-evaluate Warn Before Quit pixels (due 2026-04-24) Context: Nastia asked yesterday at 22:54: "do we still need these pixels?" No response from Alex. Action: Reply to Nastia — either confirm they're still needed or initiate removal.
[WAITING · time-critical] [DRI] — Ship-Review: [iOS] Introduce a new screen that allows usage of the toggle with Search or Duck.ai as default (due TODAY) Context: Alex posted at 17:06 — all PR + Ship Review comments addressed, builds updated, PRs ready to merge. Waiting on Design approval and main Ship Review sign-off. Plan: merge Monday → experiment starts a week after. Alessandro confirmed earlier build issues fixed. Action: If Design approval hasn't landed by tonight, follow up directly tomorrow morning before standup. Task is in WAITING — not blocked by Alex.
New / Changed — Monitoring
- iOS: Introduce a new screen... — Dominik reacted (story_reaction_added) to Alex's 17:06 status at 17:24. Informational, no action.
- Ship Review: Pull Request(s) — moved/updated in macOS Release Board at 11:16 local. No comment visible; likely a board-level update. Monitor.
- Follow-up: add support to restore onboarding state for duck.ai non-experiment flow — modified 13:50 local on macOS Release Board. No comment in snapshot.
- macOS: Fire Window animation not played when closing window using cmd+w — modified yesterday 22:23. Sitting in inbox. Not yet triaged.
- 1:1 Dominik :: Alex Regular Agenda (due Apr 14) — 4 days away. Begin adding agenda items.
Rhythms
⚠️ 1-Must: Not set today.
The 1-Must task (1213553431608884) was last modified 2026-03-07 — no comment from Alex found for today. If your 1-Must was set outside Asana, log it in the task. If not set: was today unstructured by intent, or did the Ship Review take over as the de facto priority?