Files
obsidian-vault/work/briefs/weekly/plan-2026-06-01.md
T

12 KiB
Raw Blame History

Weekly Plan — Week of 2026-06-01

Top Priority: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — due Fri 2026-06-05, parent task with active Ship Review subtask and 4 subtask PRs in flight; this is the last full work week before partial-AFK for WWDC (Jun 812), so closing it this week protects the deadline. No weekly review for 2026-05-29 was found, so this TP is derived from current DB state (top_priority section + due-date proximity).

Ship Review consolidation (one place)

  • SR subtask: Ship Review: iOS Address onboarding conflicts… — delegated; not yet opened (no comment_added story; SR open is the "Next" step Alex posted on May 29).
  • Subtask PRs (apple-browsers):
    • PR #5173 [iOS] Hide stop-generating button → CI, approved — ready to merge (subtask 1215009192158954, due 5/29).
    • PR #5149 Hide Free Plan title and nav pills → CI, approved BUT new design refinement requested 2026-06-01 by Costas + Alessandro (white→gray→white transition flash; align on transition then re-review). Subtask 1215009192158952, due 5/28.
    • PR #5145 [iOS] Ship duck.ai onboarding query-selection flow permanently → 🔴 CI failing, waiting review. Subtask Ship AI onboarding winner (Treatment B), due 5/28. Blocker: Alessandro (5/29) — "releasing Treatment B while tracker-blocker demo experiment is still running may not be feasible — would compromise data." Costas: "stick with iPhone only." Decision pending before ship.
    • Persist 'You've got this' dialogue in non-focused state [2d] — due today 2026-06-01, in progress per Alex's 5/29 status; no PR linked yet.
  • On hold: iOS: Demo tracker blocking after chat in onboarding — explicitly ON HOLD.

Quadrants

Quadrant This Week Notes
Project 75% Ship Review week; pre-AFK push. Project allocation elevated vs. 60% baseline.
AOR 10% Light week — most AOR items are quick wins; one Diego ask on macOS browser bug.
Career 10% 1:1 skipped (Dominik OOO all week). Re-route to Project Advisor doc draft.
Strategy 5% One Assessment comment if surface area appears.

Shape

Mon 2026-06-01: Ramp up + close out today's due item; respond to PR refinement asks

Tue 2026-06-02: Treatment B unblock + CI fix; Apple Weekly

Wed 2026-06-03: Open Ship Review + address PR feedback

Thu 2026-06-04: SR submission + WWDC AFK prep

  • Submit Ship Review for sign-off
  • Brief Apple team on partial AFK Jun 812 (WWDC)
  • Hand off any in-flight PRs that won't merge before Mon
  • Dominik OOO (Public Holiday)

Fri 2026-06-05: Close loops + write weekly review + WWDC handoff

Must-Not-Forget

AOR Quick Wins This Week

Sprint Backlog (pick 12 if time allows)

(+ 2 aged items >180 days in backlog — not listed: Tab preview stuck around, Duo login to Grafana)

On Radar

Career Action This Week

Picked: Draft Part 1 of Advisor Readiness doc — Readiness Self-Reflection for Potential Project Advisor (30 min, Wed)

Why picked over alternatives:

  • 1:1 prep — skipped: Dominik OOO entire week (AFK Jun 13 LDX3, AFK Jun 45 Public Holiday). Next plausible 1:1 is Tue 2026-06-09, but Alex starts partial WWDC AFK same day — may slip to mid-June.
  • Primary AOR discussion — skipped: depends on 1:1.
  • Christie calibration — skipped: no task in DB matching "Christie + calibration"; defer to next 1:1.
  • Assessment visibility — skipped: no active Assessment comment opportunity surfaced this week.
  • Project Advisor doc — highest leverage for EP3 per career-notes.md goal #1; status still "Not started" since Feb. Also builds an artifact to bring to Dominik post-WWDC.

On Radar / Participation Needed

Carried Forward from Last Week

No 2026-05-29 weekly review file exists, so "carried forward" here is reconstructed from open my_tasks + delegated PR correlation.

Flags / Conflicts

  • Missing weekly review: No 2026-05-29.md exists in briefs/weekly/. This plan is derived purely from DB state. Consider writing the missing review retroactively; next Friday's review should explicitly close this loop.
  • Possibly-deleted 1:1 task: 1214339792109087 (due 2026-05-05) flagged in snapshot ⚠️ — likely superseded by 1214933759913756. Do not action; verify on next sync.
  • PR #5145 has compounded blockers: red CI AND a product/experiment blocker (Alessandro). Monday decision (descope / iPhone-only / hold) needed before any time spent re-greening CI.

Based on DB state as of 2026-06-01 09:27 UTC snapshot. Last weekly review file (2026-05-29) not found — reconstructed from open tasks, recent stories, and delegated PR correlation. Saved to /Users/admin/obsidian/work/briefs/weekly/plan-2026-06-01.md.