Files

5.4 KiB


Daily Brief — 2026-06-11

Morning

On June 11, 1770, Captain James Cook ran HMS Endeavour aground on Australia's Great Barrier Reef. His crew spent three days lightening the ship by throwing cannons overboard, then patched the hull with rope and wool — using the very coral that pierced them as a plug while they pumped. They sailed out under their own power. Sometimes the obstacle is the solution.

🧖 Sauna day — don't skip it. 🌿 Step outside for 5 minutes before opening Slack.


Anchor: Today's focus per weekly plan: EP2 TD calibration response + async CI fix on #5145. New signals since yesterday: Ship Review put [ON HOLD] (Jun 10), 2 tasks completed (Animation Delay, cb1 disable tracker step). WWDC light-async mode ends tomorrow.


Plan for Today

  1. Merge #5271 + #5149 — both CI , approved , land-ready since Monday (~10 min)
  2. 🔴 Respond to Sam S — EP2 TD Calibration (3 days overdue, was due within 48h of Jun 8)
  3. 🔴 Clarify "Check Experiment before Jun/15" — deadline Monday, still unknown what this is
  4. 🟠 Fix CI on #5145 — must land by Jun 15, 3 failing checks blocking merge
  5. 🟠 Verify Localize duck.ai onboarding path — Smartling job status, due Jun 8 (overdue)
  6. 🟡 Batch 5 GitHub mention reviews

🔴 Urgent / Overdue

EP2 TD Calibration - Alex [OVERDUE] [Career] — Sam S left scoring notes Jun 8 asking for Alex's response on 2 mismatched calibration criteria. 48h response expected; now 3 days without reply. Alex is the blocker. Action: Open task, review Sam's rationale, post response. 15 min.

Check Experiment before Jun/15 [URGENT] [DRI] — Deadline Jun 15 (Monday, 4 days). Still unclear what experiment this refers to. Needs identification today — not Monday. Action: Open task, read comments/description. If still unclear, ping requester today.

Ship AI onboarding winner (Treatment B) — PR #5145 [OVERDUE] [DRI] — Due May 28 (14 days overdue). Must land by Jun 15 or experiment window closes. CI 🔴 (3 failing checks: Test Non-Sandbox, Translated Strings, Test Report). Review still pending. Action: Investigate CI failures on #5145, fix and push today or tomorrow.

Backlog cluster: do_later + quick_wins tasks with stale dates are not surfaced — expected, no action.


🟠 Needs Action Today

Land-ready PRs (carry-over from Monday) Both were marked "merge now" in the weekly plan but are still open:

  • #5271 iOS: Animate search experience toggle — CI , approved → merge
  • #5149 Hide Free Plan title — CI , approved → merge

Ship Reviews

Localize duck.ai onboarding path Localize duck.ai onboarding path — due Jun 8 (overdue 3 days). Smartling job launched Jun 4. Note: "duck.ai onboarding Localization!" task (GID 1215353333476330, inbox) may be the completion signal — verify that strings are imported and close the task if done.

PR Reviews (batch) 5 GitHub mentions in Needs Attention (not formal review requests). Batch after TP work block:

  • Hide Free Plan title and nav pills (likely already handling via merge)
  • [iOS][Tailored Onboarding] Present Final dialog for Duck.ai flow
  • Fix subscription sheet NTP flash and activate keyboard for chat-path try-visit dialog
  • [iOS] Remove filterAddressBarUpdates feature flag
  • iOS: 1-click access to voice chat from app open - part 1

🟡 Delegated — Follow Up Needed

AI Usage Limits submission Jeffrey added as collaborator Jun 5. Org-level API key question raised with HR/IT. Last modified Jun 5 — 6 days without update (stale). Suggested follow-up: "Any update on the API key approval from HR/IT?"

Stale/monitoring (no action required today):

  • Login autofill shows empty field (Deepankar) — due Nov 2025, very stale. Low priority.
  • Privacy Triage: Demo tracker blocking (Jake Abel) — due May 21, no recent updates.

No "GitHub match: MERGED" rows in Delegated PR Correlation — nothing to close.


🔵 Rhythms

TP: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — current TP, in top_priority section. The Ship Review version is [ON HOLD] as of Jun 10. Active critical path is PR #5145 (Ship AI onboarding winner, Treatment B) — must land by Jun 15. TP last changed ~Jun 4, not yet stale.

Next TP: Ship AI onboarding winner (Treatment B) is the identified next TP per weekly plan. Once current SR closes, check whether a "Next TP Thread" comment exists on this task — if not, post one.

Upcoming:

  • AFK ends tomorrow (Jun 12) — back to full availability Mon Jun 15
  • 1:1 with Dominik — agenda task due Jun 9 (yesterday). Likely moved to Jun 15; confirm with Dominik.
  • Jun 15: O-L Weekly Meeting + WWDC return
  • Jun 15: Hard deadlines for "Check Experiment" + CI fix on #5145
  • Jun 16: Apple Weekly Team Meeting