Now I have everything I need. Compiling the weekly review. --- # Weekly Review — Week of April 11, 2026 --- ### ✅ Moved Forward **iOS Toggle Screen (O-N TP) — shipped** The biggest move of the week. The Ship Review for *[iOS] Introduce a new screen that allows usage of the toggle with Search or Duck.ai set as the default toggle state* was completed on Apr 14. PR merged the same day, confirmed getting to internal release. Public release and experiment data collection starts Apr 20. Two follow-ups were logged: Inline Text Images support for `TypingTextAnimation` and restoring onboarding state for the non-experiment flow. Alex posted a full status on Apr 14 and set the next TP to *iOS: Demo tracker blocking after chat in onboarding* (kick-off Apr 21). **iOS 7.216.0 Release Process Exception — closed** Assigned Apr 15, handled same day. Fix was a one-character change in a `NotLocalizedString` constant — zero risk. Alex delegated to Bartek (at meetup) for approval, received "Excellent 🚀" from Bartek and sign-off from Pete. Alex marked complete Apr 16. **PR: content-scope-scripts 🔴 [major] 13.41.0 → 14.0.0 (apple-browsers) — merged** Completed Apr 14. Major version bump landed on the macOS release board. (Note: this merge caused a CI failure that's now open — see Open Loops.) **Quick Wins Days (Apr 15–17) — participated** This was a company-wide QWD week. Alex picked up *QWD: Agentic macOS UI tests virtualization* as his QWD task (due today) alongside the broader QWD sprint. AOR update action also in flight today. **No Ship Reviews open.** None active going into next week — clean slate. **No Tech Designs with LGTM this week.** None in the DB. --- ### 🔄 Didn't Move **[OVERDUE +8d] PR Check is failing on main — testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain_errorPageIsShownOnce** (due Apr 9) Sam S flagged this Apr 8 as a likely flaky test caused by unreliable CI runner internet. Assigned to Alex with a direct ask to investigate. Two automated overdue reminders since. No response or investigation yet. *Why stalled:* Coincided with iOS toggle crunch, then QWD week. *Next step:* Investigate the test failure; if confirmed flaky, mark it as such and update the task. Reply to Sam. **[OVERDUE +2d] PR Check is failing on main** (due Apr 15) Alessandro assigned Apr 15: integration test crashing with "Fatal error: The test is causing a real navigation action" after the CSS 14.0.0 merge. Alessandro explicitly tagged Alex. Automated overdue reminder triggered yesterday. *Why stalled:* Assigned during QWD — likely deprioritized. *Next step:* Investigate the fatal navigation error in the integration test. This is the more urgent of the two CI tasks. **[OVERDUE +10d] Design Review: Blinking Address Bar** (due Apr 7) Self-assigned Apr 6 as a subtask of the Ship Review. Now that the Ship Review is complete, it's unclear if this is still needed. *Next step:* Verify if this review is still required post-ship or close as resolved-with-parent. **[STALLED] FE <> iOS Sync** (macOS Release Board, top_priority section, no due date) Last modified Mar 19 — nearly 4 weeks of no activity. Sitting in top_priority section. *Next step:* Assess relevance. Is this still blocking anything? If not, move to backlog or close. **[STALLED] Follow-up: add support of Inline Text Images to TypingTextAnimation** (macOS Release Board) Added Apr 14 as a post-ship follow-up. No due date set, no activity since creation. *Next step:* Set a due date or schedule for next week. --- ### 🔗 Open Loops Carrying Forward **Ship Reviews in progress** — None. Clean. **Tech Designs awaiting re-review** — None visible. **Delegated tasks overdue** - *assertionFailure when DBP url is opened* — delegated to Anh Do, due Dec 12 2025. No activity in months. Either confirm status with Anh or close/archive. **Incidents without postmortem** — None visible. **PFRs awaiting decision summary** — None visible. **CI failures carrying over:** Two open CI tasks (see Didn't Move) carry into next week. Both are OVERDUE and have explicit asks from teammates. These need to be resolved, not just acknowledged. **Pinned tab opens link in background tab** — assigned by Alessandro Apr 13 with a re-assign offer if capacity is tight. Due today. No action taken yet during QWD. **Text selection in the address bar doesn't work as standard** — assigned Apr 16 by Alessandro (coverage for someone OOO). Due Apr 22. New this week, needs triage action next week. --- ### 📅 Next Week Setup **TP Suggestion:** *iOS: Demo tracker blocking after chat in onboarding* (1213551050320249) Alex already declared this publicly on Apr 14 (next TP post) and shifted the start to Apr 20. Kick-off is set for Apr 21 (O-N meeting). Dominik's reaction confirmed. This is the right call — the toggle work shipped, experiment data collection starts independently, and the next O-N project needs DRI momentum. **Rotation:** None active or starting. No rotation tasks in DB. **OOO watch:** - **Dominik** AFK through Apr 20 (Apple Meetup) — back in time for the 1:1 on Apr 21 ✓ - **Pete v.B.** AFK through Apr 21 — not back until Wed Apr 22 - **Android Functional Meetup cohort** (Domen, Youssef, Elle, Jorge, Cristian, Cris B, Lukasz, Catalin, Gerard) OOO Apr 20–24 — minimal impact on Alex's iOS/macOS work - **David G.** back Apr 20 after Easter holidays **1:1 with Dominik — Tuesday Apr 21** Agenda is already well-prepared. Key items pre-loaded: - TP transition: iOS toggle ✅ shipped → next TP is Demo tracker blocking (kick-off same day) - macOS browser App State Machine (ongoing) - Focus areas & career coaching - OOO May 1–8 planning *Nothing new to add from this week specifically — the main TP story is clean and positive.* --- ### 🏆 Wins 1. **Shipped the iOS Toggle Screen (O-N TP) end-to-end.** Ship Review completed, PR merged, internal release same day, public experiment live Apr 20. This was the primary TP for multiple weeks and it crossed the finish line cleanly — including proactive status updates and two follow-ups logged before anyone asked. 2. **iOS 7.216.0 Release Exception resolved in < 24h.** Received the assignment mid-afternoon Apr 15, delegated the fix to the right person, got multi-party approval, and closed it by Apr 16. Fast turnaround on a release blocker. 3. **Clean TP hand-off into next week.** Alex posted the next TP publicly on Apr 14, explained the rationale (QWD week + meetup), shifted the start date deliberately to Apr 20, and set up the kick-off. No ambiguity about what's next. ---