# Weekly Plan — Week of 2026-05-25 > Generated Sat 2026-05-30 (no prior weekly-review found for 2026-05-29; plan is built from current DB snapshot and career-notes). > Shape starts from today; main working week covers Mon 2026-06-01 → Fri 2026-06-05. **Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — umbrella due 2026-06-05; Ship Review still open and one large subtask ("Persist 'You've got this' [2d]") plus two animated/visual subtasks remain. ### Quadrants | Quadrant | This Week | Notes | |---|---|---| | Project | 75% | Ship Review week — umbrella due Fri; absorb time normally spent on 1:1 prep. | | AOR | 15% | Warn Before Quit pixel removal (direct request 2026-05-30), Monterrey-only PR follow-up, CI-failure cleanup if gaps appear. | | Career | 10% | Dominik OOO all week (Jun 1–5) → no 1:1, no 1:1 prep. Use the freed time for Project Advisor doc draft (highest-leverage item from career-notes). | | Strategy | 5% | Light; defer to next week. | ### Shape **Sat 2026-05-30:** rest / light triage - Optional: respond to [Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — Ivy clarified scope after Alex's question **Sun 2026-05-31:** rest **Mon 2026-06-01:** Persist dialogue + week kick-off - [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — TP subtask, due today - O-L Weekly Meeting - Set 1-Must = land Persist dialogue PR **Tue 2026-06-02:** Apple Weekly + finish ship items - Apple Weekly Team Meeting - [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — TP optional, originally due Jun 1 - Merge [#5149 Hide Free Plan / nav pills](https://app.asana.com/0/0/1215009192158952) if not already auto-merged (PR approved) **Wed 2026-06-03:** Open Ship Review + animations - O-N Weekly Meeting - Open [Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961) — currently unowned - Start [Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798) **Thu 2026-06-04:** Address SR feedback + AOR - Address Ship Review comments as they land - [Warn Before Quit pixel removal PR](https://app.asana.com/0/0/1212808567112832) — directly requested 2026-05-30 **Fri 2026-06-05:** Close umbrella + weekly review + career - Close umbrella TP if SR complete - Weekly review - **Career Action**: draft Part 1 of Advisor Readiness doc (30 min) ### Must-Not-Forget - [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex due 2026-06-01 — last open in-progress subtask blocking the umbrella TP; Alex's own May/29 status commits to "complete on Mon". - [ ] **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)** — assignee: Alex due 2026-05-29 (1d overdue) — Temporary Pixels project posted automated request 2026-05-30: "please prepare a PR. If you need more time, add a comment and adjust the due date." Quote requires either a PR or a comment. - [ ] **[Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961)** — assignee: unassigned no owner yet, umbrella due Fri 2026-06-05 — Alex owns the umbrella, so the SR subtask falls to him to open before reviewers can sign off. - [ ] **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex due 2026-05-27 (3d overdue) — flagged in Diego's update 2026-05-30: first Monterey+ release ships Jun 15, so this PR needs to merge well before that. - [ ] **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — assignee: Alex due 2026-05-26 (4d overdue) — explicitly 5-minute timebox; one of the cheapest items to close. ### AOR Quick Wins This Week - **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)** overdue 1d — already in MNF; prepare PR removing the pixel OR comment back with new ETA. - **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)** overdue 36d — pairs naturally with the Warn-Before-Quit pixel removal; batch them in one PR. - **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** overdue 3d — also in MNF; short PR, run + merge. - **[Follow-up: add Inline Text Images support to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** overdue 2d — small follow-up from a recently shipped feature; close within a day. - **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** overdue 4d — 5-min anonymous survey, no PR required. ### Sprint Backlog (pick 1–2 if time allows) - **[PR Check is failing on main — testWhenTabWith…ConnectionLostErrorActivatedAndReloadFailsAgain](https://app.asana.com/0/0/1213975496167929)** overdue 38d — flaky test on main; if not already fixed, disable or stabilise. - **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)** overdue 15d — second CI failure; triage and either fix or hand off. - **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)** overdue 29d — Internal Product Feedback; small AOR. - **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)** overdue 29d — Internal Product Feedback; small AOR. - **[Review Overdue Tasks Summary — 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)** overdue 123d — meta-task; spend 30 min closing/snoozing 5–10 stale items. (+ 3 aged items >180 days in backlog — not listed) ### On Radar - **GitHub review requests (6 pending)** — `[macOS] Improve value transformer failure observability`, `[macOS] Avoid a force unwrap crash when calling debugDescription`, `Bump nativeStorage rollout to 100%`, `Enable ad blocking feature availability to everyone - soft launch`, `Fix maestro tests`, `Enable iPad toggle for iOS 7.211`. Batch one review pass on a gap day; closest to AOR are the two `[macOS]` ones. - **TD: [Apple pixels for evaluating when to end support for an OS](https://app.asana.com/0/0/1214950124367783)** — privacy triage filed 2026-05-30; relevant to Monterrey-only work above. Engage only if directly asked. ### Career Action This Week **Draft Part 1 of Advisor Readiness doc (30 min)** — career-notes Goal #1 (Project Advisor, status: Not started) is the highest-leverage EP3 lever. All other career options blocked: Dominik OOO all week → no 1:1, no 1:1 prep, no calibration ping. Primary AOR / Assessment visibility deferred to first 1:1 after Dominik returns (Jun 8+). Target: Fri 2026-06-05 afternoon. ### On Radar / Participation Needed - **[Desktop Browsers: Windows — Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)** Ivy clarified 2026-05-30 that Alex's plan IS the foundation, not a duplicate — engage with one short reply confirming alignment so the plan moves forward Mon/Tue. - **[Sorting in big HTML is 15sec compared to Vivaldi's 2 second](https://app.asana.com/0/0/1215191840665591)** Ivy 2026-05-30 proposed a perf-test replication using Sam's framework — monitor; only engage if implementation lands on macOS-side. - **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)** Elle 2026-05-30 flagged that macOS no longer sends `site_loading_performance` pixel — directly touches Alex's AOR-adjacent pixel work. Engage with a one-line acknowledgement and a triage owner. ### Carried Forward from Last Week - **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — Alex (DRI) → see TP section above. - **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** — Alex status per Alex's May/29 comment: shipping flow PR up. Confirm merged this week; close subtask. - **[Hide "stop chat" button in the input box](https://app.asana.com/0/0/1215009192158954)** — Alex PR #5173 — CI green, waiting on review. Nudge reviewer Mon morning. - **[Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952)** — Alex PR #5149 — CI green, already approved. Confirm merge + close task Mon. - **[Ship duck.ai onboarding query-selection flow permanently (PR #5145)](https://app.asana.com/0/0/1215009192158955)** — Alex PR CI is RED; fix before requesting re-review. - **[Demo tracker blocking after chat in onboarding [ON HOLD]](https://app.asana.com/0/0/1213551050320249)** — Alex (DRI, on hold) due 2026-06-05; remains on hold until upstream blocker clears. No action unless status changes. - **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — Alex Dominik OOO Jun 1–5. Next 1:1 likely Jun 9 or later — keep adding notes; no prep deadline this week. --- *Based on DB snapshot 2026-05-30 08:09 UTC. No prior weekly-review available for 2026-05-29 — plan built from snapshot + career-notes + recurring-rhythms.* Saved to `/Users/admin/obsidian/work/briefs/weekly/plan-2026-05-25.md`. **Notes on inputs**: - No `weekly/2026-05-29.md` review existed; plan was built solely from the DB snapshot (`asana_context.md`, generated 2026-05-30 08:09 UTC), career-notes, and recurring-rhythms. - **Dominik OOO confirmed for the full work-week** (AFK Jun 1–3 LDX3 + Jun 4–5 holiday) → no 1:1 this week, no 1:1 prep. - TP confirmed unchanged: iOS Address onboarding umbrella, due Fri 2026-06-05. Ship Review subtask still unowned — flagged in MNF. - AOR pressure point: automated comment on Warn-Before-Quit pixel posted 2026-05-30 → either PR or status comment required.