From df957311e4b8a92cd77472ee6130488af5444120 Mon Sep 17 00:00:00 2001 From: Alexey Martemyanov Date: Thu, 28 May 2026 15:01:37 +0600 Subject: [PATCH] [2026-05-28] family zoom link, daily brief, inbox triage --- family/sort/zoom-ссылка.md | 2 +- work/briefs/daily/2026-05-28.md | 114 ++++++++++++++++++++++++++++++++ work/briefs/inbox/2026-05-28.md | 21 ++++-- 3 files changed, 131 insertions(+), 6 deletions(-) create mode 100644 work/briefs/daily/2026-05-28.md diff --git a/family/sort/zoom-ссылка.md b/family/sort/zoom-ссылка.md index 7a74f625..5d029fa5 100644 --- a/family/sort/zoom-ссылка.md +++ b/family/sort/zoom-ссылка.md @@ -4,6 +4,6 @@ aliases: ["zoom-ссылка", "keep-import"] tags: ["sort", "keep-import"] updated: "2026-05-17" --- -# Моя Zoom ссылка +# Моя Zoom ссылка/My Zoom link https://duckduckgo.zoom.us/my/malex \ No newline at end of file diff --git a/work/briefs/daily/2026-05-28.md b/work/briefs/daily/2026-05-28.md new file mode 100644 index 00000000..d330c0c4 --- /dev/null +++ b/work/briefs/daily/2026-05-28.md @@ -0,0 +1,114 @@ +--- +## Daily Brief — 2026-05-28 + +### ✨ Morning +On May 28, 1959, two monkeys — Able (a rhesus) and Baker (a squirrel monkey small enough to fit in a coconut) — rode a Jupiter rocket 360 miles up at 10,000 mph and became the first primates ever recovered alive from space. Baker lived another 25 years afterward, mostly on a diet of bananas at the U.S. Space & Rocket Center. +💧 Start with a glass of water. +🧖 Sauna day — don't skip it. + +Today's focus per weekly plan: Deep work on new TP — **Address Bar Toggle: Animated Assets [2-3d]** (primary) + Try Visiting a Site Background (secondary). Buffer for CI/AOR. +New signals since yesterday: 15 task changes (mostly AFK auto-rolls), 0 new comments (AFK respect held). One correction from yesterday's brief: the **Demo tracker PR (1214425079182350) is NOT deleted** — it's still open and now 1d overdue. + +--- + +## Plan for Today + +1. ⚡ **Desktop Browser Feature Owner Survey** — anonymous, 5-min timebox. Was item #1 Wed; still uncompleted. Knock it out before anything else. +2. 🔴 **Draft Incident Postmortem: AI Agent use** — **DUE TODAY**. Security incident, 7 days since assigned, no draft. First real work block. +3. 🔴 **Nudge Jake on Privacy Triage** (7d overdue) — one-line ping; blocks closing old TP. +4. 🔴 **Demo tracker PR — verify state + reassign reviewer** (1d overdue). Yesterday's brief mistakenly assumed it was completed; it's not. +5. 🟠 **Reply to Alessandro AB1–AB5** on TP kick-off + close Project Advisor async (Ship Review subtask already exists). +6. 🟠 **TP deep work block — Animated Assets [2-3d]** (primary block of the day). +7. 🟠 **TP subtask: Ship AI onboarding winner [0.5d]** (due today) — pair into TP block if room. +8. 🟠 **Triage: Inline Text Images to TypingTextAnimation** (due today; macOS Release Board). +9. 🟠 **Reply to Nastia** on Warn Before Quit pixels — quick yes/no. +10. 📋 **8 PR reviews queued** — batch after TP block. + +Ordering notes: No 1-Must override (yesterday's 1-Must was completed at 05:08 today). Item 1 is the easy momentum starter. Items 2–4 are hard-due-today / overdue blockers. Items 5–7 are the weekly plan focus. Items 8–10 are smaller asks / batched work. + +--- + +### 🔴 Urgent / Overdue + +**[DUE TODAY] DRI** — [Incident Postmortem: AI Agent use via likely external Discord service](https://app.asana.com/0/0/1214996544314182) (due 2026-05-28) +Context: Assigned 2026-05-22; 7 days; no draft visible. Security-category incident. Sibling task [Postmortem: Security Triage AI: edit link](https://app.asana.com/0/0/1214996544314187) has no due date, 7 days old. +Action: Draft postmortem OR post status comment with timeline today. Handle this BEFORE the TP deep block — security postmortems are not negotiable on due date. + +**[OVERDUE 1d] DRI / PR-author** — [PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350) (due 2026-05-27) +Context: Last week's TP shipping PR. Alessandro asked 2026-05-22 about toggle visibility during onboarding. Alex publicly committed Mon to "review pass and reassign to [reviewer]." No new activity since Mon. +Action: Open PR, answer Alessandro's toggle question if not done, hand reviewer baton off. ~30 min. + +**[OVERDUE 6d] DRI** — [iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) (due 2026-05-22) +Context: Parent task of old TP. Still blocked by (a) Privacy Triage (Jake, 7d overdue), (b) the PR above. Costas asked Mon for a wrap-up pinned comment; Alex posted one at 14:29 Mon. +Action: Once PR is handed off and Jake nudged, this is positioned to close on Fri. No action on the parent today beyond unblocking pieces. + +**[OVERDUE 2d] DRI** — [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) (due 2026-05-26) +Context: 5-min anonymous timebox. Was item #1 Wednesday; AFK absorbed it. No content blocker. +Action: First 5 minutes of the day. Done. + +**[OVERDUE 6d] DRI** — [Full Analysis](https://app.asana.com/0/0/1214900901154134) (due 2026-05-22) +Context: Ambiguous title; no project context in snapshot. Stale since 2026-05-21. +Action: Open, either action or close. 10 min budget; if it's not obvious what it is, close or re-scope. + +**[OVERDUE 13d] AOR** — [PR Check is failing on main](https://app.asana.com/0/0/1214797526093576) (due 2026-05-15) +Context: Main-branch CI failure; in inbox. No activity since May 17. Has been carried across two daily briefs without progress. +Action: Diagnose during AOR buffer block (after TP). If it's not a 30-min fix, post a status comment naming the test and add to backlog. Don't let it sit unacknowledged a third day. + +**Backlog cluster** (informational — stale dates expected, do_later / quick_wins / aged inbox): CI failing test - testWhenTabWithConnectionLost (active, Apr 22) · Pinned tab opens link in background (May 1) · Text selection in address bar (May 1) · Tab preview stuck (Apr 2025) · Duo login Grafana · Assertion Failure Pixel · Review Overdue Tasks meta (Jan 2026) · Feature flag warnBeforeQuit · mac_malicious-site-protection client-timeout. Not actioned today. + +--- + +### 🟠 Needs Action Today + +**AUTHOR — New TP: reply to Alessandro AB1–AB5** +[iOS Address onboarding TP](https://app.asana.com/0/0/1214592943696234) — Alessandro posted 5 scope questions on the [kick-off task](https://app.asana.com/0/0/1214592851898713) at 14:25 Mon. Alex posted a kick-off update at 21:30 Mon, but it didn't explicitly answer AB1–AB5. No new comments since (AFK respected). +Action: Reply in-thread to each of AB1–AB5. Specifically AB1 — add implementation estimate to [Ship AI onboarding winner](https://app.asana.com/0/0/1215009192158955). AB2 — clarify animated assets scope/assignment. +Also: post on [DRI ↔ Project Advisor async](https://app.asana.com/0/0/1213551072611261) confirming Ship Review task [1215009192158961](https://app.asana.com/0/0/1215009192158961) already exists. + +**DRI — TP deep work: Animated Assets [2-3d] (primary block today)** +[Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798) — due 2026-06-04. Per weekly plan, this is Thursday's primary block. +Action: After items 1–5 above, this is the long block of the day. Try Visiting a Site Background is the secondary if assets land faster than estimated. + +**DRI — TP subtask due today: Ship AI onboarding winner (Treatment B) [0.5d]** +[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — due 2026-05-28. Half-day estimate; small relative to Animated Assets. +Action: Fold into TP block if there's a natural break. Add Alessandro's-requested estimate to the task notes (covers AB1 simultaneously). + +**DRI — Follow-up: Inline Text Images to TypingTextAnimation (due today)** +[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193) — due 2026-05-28. macOS Release Board. New in cycle; not yet triaged. There is a related [PR #4663](https://github.com/duckduckgo/apple-browsers/pull/4663) in your open PRs ("Add inline image support to AnimatableTypingText") — likely tied. +Action: Open both, decide if the task is "PR is the work" (close task when PR merges) or further work needed. 10 min. + +**DRI — Nastia's query on Warn Before Quit pixels** +[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832) — Nastia commented Mon 16:50: "do you still need these pixels?" +Action: Quick yes/no reply. Same task as the linked feature-flag-warnBeforeQuit removal in backlog — pair them if you can answer in one go. + +**PR Reviews — batch (8 queued, no change vs yesterday)** +Drop macOS Big Sur · Simplify TabBarViewController · Bump nativeStorage 100% · Enable ad blocking soft launch · Improve value transformer failure observability · Avoid force unwrap crash · Fix maestro tests · Enable iPad toggle iOS 7.211. +Action: After TP block, single batch pass. Full list is in `asana_context.md`. + +--- + +### 🟡 Delegated — Follow Up Needed + +**OVERDUE 7d** — [Privacy Triage: Apple — iOS: Demo tracker blocking](https://app.asana.com/0/0/1214965405681675) — Jake Abel, due 2026-05-21 +No activity since May 20. Directly blocks closing old TP. Yesterday's brief flagged this; AFK day passed without contact. +Follow-up: "Hi Jake — back from the holiday. Any update on this privacy triage? It was due May 21 and is the last open piece blocking close-out of the Demo tracker TP." + +**OVERDUE 3d** — [🤖 Check for dependabot PRs](https://app.asana.com/0/0/1215057989642782) — Tom Strba, due 2026-05-25 +Maintenance cycle subtask. Likely just a rolled-forward maintenance item; verify if it should be marked done or extended into Tom's current week. + +**Due tomorrow** — [Pinned tab activates in other window unpinning](https://app.asana.com/0/0/1210705465887828) — Juan Pereira, due 2026-05-29. No follow-up needed today. + +**GitHub ↔ Asana correlation**: no merged-but-not-closed delegated tasks detected. + +--- + +### 🔵 Rhythms + +**TP:** [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — due 2026-06-05. Kick-off complete ✅. Alessandro AB1–AB5 reply still pending (#1 conversational debt on TP). Animated Assets is today's primary block. Next TP Thread: ✅ already open. + +**Upcoming:** +- 📅 Fri 2026-05-29: Close loops + weekly review (catch up on missing 2026-05-22 review) + handoff [macOS App Maintenance](https://app.asana.com/0/0/1215057986055515) to Tom (already assigned). +- 📅 Mon 2026-06-01: O-L Weekly Meeting. Dominik OOO begins 2026-06-01 (LDX3 through Jun 3). +- 📅 Tue 2026-06-02: Apple Weekly Team Meeting — Dominik OOO, host needed (Dominik flagged Mon). +- 📅 Wed 2026-06-03: O-N Weekly Meeting. +- 📅 Jun 8–12: WWDC'26 (partly AFK) — 11 days out. diff --git a/work/briefs/inbox/2026-05-28.md b/work/briefs/inbox/2026-05-28.md index 774db9a7..ff84bcaf 100644 --- a/work/briefs/inbox/2026-05-28.md +++ b/work/briefs/inbox/2026-05-28.md @@ -1,15 +1,26 @@ -## Inbox Triage — 2026-05-28 (since 12:32:27) +## Inbox Triage — 2026-05-28 (since 2026-05-28 14:07) ### New / Changed — Action Required -_Nothing new._ +- **[New assignment]** — [PR: Simplify tab access in TabBarViewController (apple-browsers)](https://app.asana.com/0/0/1215059168411571) — due today, inbox section (mod 08:35 UTC) + Context: New PR-review task landed in your inbox in the last ~30 min. Title suggests a refactor PR in apple-browsers awaiting your review. + Action: Open the task, find the PR link, do a first-pass review or triage to a reasonable reviewer if it's not yours. + +- **[New assignment]** — [Incident Postmortem: AI Agent use via likely external Discord service](https://app.asana.com/0/0/1214996544314182) — due today, Incident Postmortems project (mod 08:23 UTC) + Context: New incident postmortem assigned to you, due end of day. No comments yet. + Action: Open the task, read the incident summary, confirm scope/role (author vs reviewer), and either start drafting or schedule a time block. ### New / Changed — Monitoring -_Nothing new._ +_Nothing qualifies — no new human comments on your open tasks in the window, no Ship Review / Tech Design status changes captured in the snapshot, no fresh @mentions in the snapshot's recent-comments section._ ### Nothing new -Inbox quiet — nothing new since 12:32:27. +- No new human comments on your open tasks (Recent Comments 24h shows 0). +- All "Comments awaiting reply" entries in status.md predate SINCE or are AOR follower noise / Dax-the-Duck bot. +- GitHub review requests / mentions in the snapshot are cumulative (no timestamps) — handled in daily brief, not here. -> Note: @mentions DB query unavailable (no DB access on this host). Snapshot freshness: 06:36 UTC. Triage window: ~30 min. +### Caveats + +- Snapshot was generated 2026-05-28 08:38 UTC; SINCE = 08:07 UTC → only ~30 min of post-SINCE activity is covered. If you ran a sync just before this triage, more events may exist that aren't in the snapshot yet. +- STEP 1b / 1c (direct DB query for @mentions across the workspace) was **skipped** — `envdir` / `psql` are not installed on this machine, so the `stories` table couldn't be queried. Any @mention outside your `my_tasks` scope is not reflected above.