[2026-06-01] weekly plan cleanup — remove HTML comments, tighten phrasing
This commit is contained in:
@@ -68,7 +68,6 @@
|
|||||||
due 2026-05-27 (overdue 5d) — Diego's comment Sat: "last Big Sur version releases Jun 8, Monterey+ version merges next week, public release Jun 15." Alex's PR is on the critical path.
|
due 2026-05-27 (overdue 5d) — Diego's comment Sat: "last Big Sur version releases Jun 8, Monterey+ version merges next week, public release Jun 15." Alex's PR is on the critical path.
|
||||||
|
|
||||||
### AOR Quick Wins This Week
|
### AOR Quick Wins This Week
|
||||||
<!-- Quick-actionable overdue tasks (<2h each). Schedule in gap days. -->
|
|
||||||
|
|
||||||
- **[PR Check is failing on main - testWhenTab...errorPageIsShownOnce](https://app.asana.com/0/0/1213975496167929)**
|
- **[PR Check is failing on main - testWhenTab...errorPageIsShownOnce](https://app.asana.com/0/0/1213975496167929)**
|
||||||
overdue 40 days — CI failing test on main; investigate flake vs real regression, disable or fix.
|
overdue 40 days — CI failing test on main; investigate flake vs real regression, disable or fix.
|
||||||
@@ -80,10 +79,9 @@
|
|||||||
overdue 4 days — PR #4663 is already up (draft); review and promote out of draft.
|
overdue 4 days — PR #4663 is already up (draft); review and promote out of draft.
|
||||||
|
|
||||||
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
|
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
|
||||||
due 2026-04-24 (do_later section but flagged today) — feature flag cleanup; quick win if related ship is shipped.
|
due 2026-04-24 — feature flag cleanup; quick win if related ship is shipped.
|
||||||
|
|
||||||
### Sprint Backlog (pick 1–2 if time allows)
|
### Sprint Backlog (pick 1–2 if time allows)
|
||||||
<!-- Mid-age overdue assigned tasks (14-180 days). -->
|
|
||||||
|
|
||||||
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
|
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
|
||||||
due 2026-05-01 (31d overdue) — Internal Product Feedback inbox; likely AOR-touching.
|
due 2026-05-01 (31d overdue) — Internal Product Feedback inbox; likely AOR-touching.
|
||||||
@@ -97,10 +95,9 @@
|
|||||||
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
|
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
|
||||||
due 2025-09-17 (257d overdue) — pixel investigation; verify still relevant before working.
|
due 2025-09-17 (257d overdue) — pixel investigation; verify still relevant before working.
|
||||||
|
|
||||||
(+ 3 aged items >180 days in backlog — not listed: tab preview stuck 412d, Duo login Grafana 313d, Assertion Pixel 257d.)
|
(+ 3 aged items >180 days in backlog — not listed: tab preview stuck 412d, Duo login Grafana 313d.)
|
||||||
|
|
||||||
### On Radar
|
### On Radar
|
||||||
<!-- Non-assigned items touching Alex's AOR or work. -->
|
|
||||||
|
|
||||||
- **[Drop macOS 11 Big Sur Support](https://app.asana.com/0/0/1210470859071348)** — Diego: SR completed, last Big Sur release Jun 8, Monterey+ release Jun 15. Alex's "Make Monterrey-only" PR is on this critical path — keep in sync.
|
- **[Drop macOS 11 Big Sur Support](https://app.asana.com/0/0/1210470859071348)** — Diego: SR completed, last Big Sur release Jun 8, Monterey+ release Jun 15. Alex's "Make Monterrey-only" PR is on this critical path — keep in sync.
|
||||||
- **[SIGKILL inside MainViewController chrome bar reveal animation](https://app.asana.com/0/0/1215224247451374)** — Eduardo Pinto added defensive weak captures; Sentry/crash AOR touchpoint, monitor merge.
|
- **[SIGKILL inside MainViewController chrome bar reveal animation](https://app.asana.com/0/0/1215224247451374)** — Eduardo Pinto added defensive weak captures; Sentry/crash AOR touchpoint, monitor merge.
|
||||||
@@ -133,7 +130,7 @@ Why this one (priority 1 from career-notes):
|
|||||||
|
|
||||||
### Carried Forward from Last Week
|
### Carried Forward from Last Week
|
||||||
|
|
||||||
No prior weekly review exists — nothing to carry forward formally. The closest equivalents are:
|
No prior weekly review exists — nothing to carry forward formally. The closest equivalents are stale `active`-section tasks:
|
||||||
|
|
||||||
- **[Cursor integration: configure VSCode support](https://app.asana.com/0/0/1209808486380252)** — assignee: Alex
|
- **[Cursor integration: configure VSCode support](https://app.asana.com/0/0/1209808486380252)** — assignee: Alex
|
||||||
In `active` section, last modified 2026-05-06; not advanced in 3+ weeks. Decide: pick up or move to `do_later`.
|
In `active` section, last modified 2026-05-06; not advanced in 3+ weeks. Decide: pick up or move to `do_later`.
|
||||||
@@ -144,7 +141,7 @@ No prior weekly review exists — nothing to carry forward formally. The closest
|
|||||||
- **[UI Tests refinement](https://app.asana.com/0/0/1210056873095697)** — assignee: Alex
|
- **[UI Tests refinement](https://app.asana.com/0/0/1210056873095697)** — assignee: Alex
|
||||||
In `active` section, last modified 2026-02-11; almost certainly stale. Status decision needed.
|
In `active` section, last modified 2026-02-11; almost certainly stale. Status decision needed.
|
||||||
|
|
||||||
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214339792109087)** — possibly deleted (per snapshot ⚠️) — flagged for verification; do not act until confirmed. Current active agenda task is gid 1214933759913756 (due 2026-05-26).
|
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214339792109087)** — possibly deleted (per snapshot ⚠️) — flagged for verification; do not act until confirmed. Current active agenda task is gid 1214933759913756.
|
||||||
|
|
||||||
---
|
---
|
||||||
*Based on DB state as of 2026-06-01 (no prior weekly review available). Sync freshness: 2026-06-01 01:01 UTC.*
|
*Based on DB state as of 2026-06-01 (no prior weekly review available). Sync freshness: 2026-06-01 01:01 UTC. Saved to `/Users/admin/obsidian/work/briefs/weekly/plan-2026-06-01.md`.*
|
||||||
|
|||||||
Reference in New Issue
Block a user