[2026-05-31] daily brief, inbox brief, weekly plan

This commit is contained in:
Alexey Martemyanov
2026-05-31 15:01:26 +06:00
parent 1cfe09dc70
commit af5f59c5a8
3 changed files with 257 additions and 0 deletions
+139
View File
@@ -0,0 +1,139 @@
# Weekly Plan — Week of 2026-05-31 (covers Mon 2026-06-01 → Fri 2026-06-05)
> **Context flag**: No weekly-review file exists at `/Users/admin/obsidian/work/briefs/weekly/2026-05-29.md` (the entire `weekly/` directory was missing — just created). Plan is built from DB snapshot only — carried-forward items inferred from current open tasks + PR state, not from a written review. Recommend running the weekly-review job for 2026-05-29 to establish a baseline.
> **Dominik OOO all week**: MonWed LDX3 26 (gid 1213155317359113), ThuFri Public Holiday (gid 1214633979837626). **No 1:1 this week.** Next available 1:1 window: ~Jun 9. Career time redirected to Project Advisor doc draft.
**Top Priority**: Ship the iOS Duck.ai onboarding launch — close out the 4 overdue Treatment B subtasks (Ship AI onboarding winner, Hide Free plan, Hide stop-chat button, Persist 'You've got this'). All 4 are in `top_priority` section, all DRI, three are 23 days overdue, and PR #5149 is already approved + green CI awaiting merge.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 65% | iOS Duck.ai onboarding ship-out + Address Bar Toggle assets (due 6/4) + Demo tracker blocking (due 6/5, currently ON HOLD — needs unblock check) |
| AOR | 15% | Merge PR: Monterrey-only macOS (overdue 4d); investigate 2 CI-failing PR Check tasks; review Sentry SIGKILL PR (Eduardo) — AOR-secondary Crash Reporting |
| Career | 15% | Dominik OOO → no 1:1. Substitute the saved 1:1-prep time with Project Advisor doc Part 1 (highest-leverage EP3 lever — currently "Not started") |
| Strategy | 5% | Watch Fire Button simplify design thread; respond if direct ask. Light week. |
### Shape
**Mon 6/1:** TP push — close out overdue onboarding subtasks. 'Persist You've got this' due today.
- [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955) — parent ship task
- [Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952) — PR #5149 approved + green, **merge today**
- [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — due today
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — also due today
- O-L Weekly Meeting ([1215106190309457](https://app.asana.com/0/0/1215106190309457))
**Tue 6/2:** TP — unblock and ship #5145 (CI red); chase review on #5173.
- [Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954) — PR #5173 ✅ CI, nudge reviewer
- Investigate / fix CI on PR #5145
- Apple Weekly Team Meeting ([1215138977402987](https://app.asana.com/0/0/1215138977402987))
**Wed 6/3:** AOR + close remaining onboarding loose ends.
- [PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916) — overdue 4d
- [PR Check is failing on main](https://app.asana.com/0/0/1214797526093576) — investigate
- O-N Weekly Meeting ([1215156632997364](https://app.asana.com/0/0/1215156632997364))
**Thu 6/4:** Project deliverable + Career block.
- [Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798) — due today
- **Career**: Draft Part 1 of Advisor Readiness doc (30 min) — [1210386994396212](https://app.asana.com/0/0/1210386994396212)
**Fri 6/5:** Demo tracker DRI deliverable + close-out + weekly review.
- [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — due today
- [DRI <> Project Advisor async for Demo tracker blocking](https://app.asana.com/0/0/1213551072611261) — verify ON HOLD on parent [1213551050320249](https://app.asana.com/0/0/1213551050320249); escalate if still blocked
- Write weekly review for 2026-06-05
### Must-Not-Forget
- [ ] **[Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952)** — assignee: Alex
due 2026-05-28 (3d overdue) — PR #5149 has approval + green CI. Only blocker is hitting "merge". Do Mon AM.
- [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 (Mon) — 2d sized. Must finish Mon/Tue to keep ship cluster on track.
- [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
due 2026-05-28 (3d overdue) — Parent / coordination task. Close once subtasks ship.
- [ ] **[PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
due 2026-05-27 (4d overdue) — Diego confirmed Jun 8 is Big Sur's last; this is the Monterrey+ follow-up. Direct dependency on next release train.
- [ ] **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex
due 2026-06-05 (Fri) — DRI task, downstream of Treatment B shipping. Protect Thu/Fri.
### AOR Quick Wins This Week
- **[Desktop Browser Feature Owner Survey [5 minute timebox]](https://app.asana.com/0/0/1214940335721015)**
overdue 5 days — 5-min anonymous survey, just do it.
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
overdue 124 days — quick triage pass.
- **[Follow-up: add Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)**
overdue 3 days — PR #4663 already exists (draft, ✅ CI). Promote out of draft, request review.
### Sprint Backlog (pick 12 if time allows)
- **[PR Check failing - testWhenTabWithConnectionLostErrorActivated...](https://app.asana.com/0/0/1213975496167929)**
due 2026-04-22 (39d overdue) — flaky/failing test in Apple CI.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
due 2026-05-15 (16d overdue) — investigate; may share root cause with above.
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
due 2026-05-01 (30d overdue) — needs triage decision.
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
due 2026-05-01 (30d overdue) — related to existing PR #4630.
(+ 3 aged items >180 days in backlog — not listed.)
### On Radar
- **TD/PR: SIGKILL inside MainViewController chrome bar reveal animation ([1215224247451374](https://app.asana.com/0/0/1215224247451374))** — Eduardo Pinto put up defensive-weak-captures PR for a Sentry crash; touches Crash Reporting AOR-secondary. Skim; comment if pattern looks wrong.
- **Desktop Browsers: Design - Simplify Fire Button ([1215239862935826](https://app.asana.com/0/0/1215239862935826))** — Peter D + Mark aligning on timing; may produce Apple-team work later.
- **AOR: Desktop Browsers Operational Health ([1214175673709906](https://app.asana.com/0/0/1214175673709906))** — Elle flagged missing `site_loading` pixel on macOS — directly Alex's pixel-instrumentation territory.
- **Drop macOS 11 Big Sur Support ([1210470859071348](https://app.asana.com/0/0/1210470859071348))** — direct context for Alex's overdue Monterrey-only PR.
### Career Action This Week
**Picked: Draft Part 1 of Advisor Readiness doc (30 min)** — Project Advisor goal is "Not started" per career-notes.md, highest-leverage EP3 lever. Skipped: (2) Primary AOR discussion — needs Dominik for 1:1, he's OOO. (3) Christie calibration follow-up — defer to next week with Dominik back. (4) Assessment comment — none active this week. (5) 1:1 prep — no 1:1 (Dominik OOO). Task: [Readiness Self-Reflection for Potential Project Advisor](https://app.asana.com/0/0/1210386994396212). Block Thu afternoon.
### On Radar / Participation Needed
- **[Sorting in big HTML is 15sec compared to Vivaldi's 2 second](https://app.asana.com/0/0/1215191840665591)**
Ivy suggested quick-win performance-test replication — touches macOS perf. Monitor.
- **[[macOS] Reduce real WKWebView loads during unit tests](https://app.asana.com/0/0/1215254745211936)**
Sam S exploring WKWebView CI crash fix; affects macOS test stability. Monitor.
- **[CEF: Failing tests when 'setTabTitlesEarly' is enabled](https://app.asana.com/0/0/1214378030768173)**
Kris W zeroing in on root cause; CEF-side. Monitor only.
### Carried Forward from Last Week
<!-- No weekly-review file to source from; inferred from open-task + PR state -->
- **[Ship AI onboarding winner cluster (4 subtasks)](https://app.asana.com/0/0/1215009192158955)** — Alex
→ see TP section above.
- **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — Alex
→ see Must-Not-Forget above.
- **[Address Bar Toggle Selection: Animated Assets](https://app.asana.com/0/0/1214627423981798)** — Alex
Due 2026-06-04 (Thu) — protect Thu.
- **[Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342)** — Alex
Due 2026-06-01 (Mon) — verify acceptance criteria before starting.
- **[ON HOLD: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249)** — Alex
Due 2026-06-05; ON HOLD label. Check unblock by Wed; escalate if still blocked.
- **[DRI <> Project Advisor async for Demo tracker blocking](https://app.asana.com/0/0/1213551072611261)** — Alex
No due date, pairs with above. Resolve Fri.
- **PR #4663 (TypingTextAnimation Inline Images)** — draft, ✅ CI; matches Asana [1214040804696193](https://app.asana.com/0/0/1214040804696193). Promote out of draft.
- **PR #4636 / #4634 / #4610 / #4559 — 4 executor PRs with 🔴 CI** — diagnose during gap; do not let them rot.
---
*Based on DB snapshot 2026-05-31 08:05 UTC (no weekly-review file present for 2026-05-29) + recurring-rhythms.md + career-notes.md. Saved to `/Users/admin/obsidian/work/briefs/weekly/plan-2026-05-25.md`.*