[2026-05-15] vault restructure: personal-os plans → personal/projects/personal-os, briefs → work/briefs

This commit is contained in:
Alexey Martemyanov
2026-05-15 14:17:41 +06:00
parent 00f89f49d0
commit 4f4358d76b
72 changed files with 5797 additions and 0 deletions
+106
View File
@@ -0,0 +1,106 @@
Now I have all the data I need. Let me compile the brief.
---
## Daily Brief — 2026-04-15
### 🔴 Urgent / Overdue
**1. OVERDUE [DRI] — PR Check failing on main — testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain** `gid:1213975496167929`
- Context: Due 2026-04-09 (6 days overdue). Sam flagged Apr 8 as "looks like a flaky runner connection" — no investigation response from Alex yet.
- Action: Check CI runner logs / attempt local reproduction; reply to Sam with findings ("investigating" or "confirmed flaky — disabling pending fix").
**2. NEEDS ACTION [DRI] — NEW CI failure: PR Check is failing on main** `gid:1214067738586364`
- Context: New task, due **today** (Apr 15). Alessandro commented at 02:14 UTC: *"Fatal error: The test is causing a real navigation action to https://duckduckgo.com/ — this integration test crashed after merging c-s-s into main. Could you please take a look?"* Direct ask to Alex; direct consequence of yesterday's c-s-s major merge.
- Action: Investigate the crashed integration test; respond to Alessandro with findings or a fix.
**3. OVERDUE [DELEGATED] — Alex: Calibration for EP2/3 reviews for Apple engineers** `gid:1213760134490549`
- Context: Assigned to Christie; due 2026-04-03 (12 days overdue). No confirmation of submission. Dominik OOO until Apr 21 — can't escalate via 1:1 until Apr 28.
- Action: Ping Christie directly: *"Hey Christie — quick check-in on the EP2/3 calibration submission — were you able to get that in?"*
> **Must-Not-Forget status check**: `PR: content-scope-scripts 🔴 [major] 13.41.0 → 14.0.0` `gid:1214050584863995` — ✅ **COMPLETED yesterday** (Apr 14, 12:50 UTC). Off the list.
> **Backlog cluster** (planning section, no new activity): `Assertion Failure Pixel Anomaly 2025/09/15` (7mo overdue) and `Review Overdue Tasks Summary Jan 2026` (77d overdue). Not urgent today — schedule a 20-min triage pass later this week.
---
### 🟠 Needs Action Today
**Wednesday = 🎯 Quick Wins Day 1**
**CI / Testing — two active fires**
- [DRI] New CI crash `gid:1214067738586364` — due today; Alessandro's direct ask (see 🔴 above). Elevated above QWD plan.
- [DRI] `CI test: testWhenTabWithConnectionLost…` `gid:1213975496167929` — 6d overdue; planned QWD target. Investigate, disable if flaky, respond to Sam.
**PR Reviews**
- [REVIEWER] **`[iOS/macOS] Bump C-S-S to 14.0.0`** — NEW GitHub review request today; direct follow-on to yesterday's c-s-s major review you completed. Review and approve or flag.
- [REVIEWER] `macOS: Fire Window animation not played when closing window using cmd+w` `gid:1213760440471324` — Dominik's PR; stalled 3+ weeks; Dominik returns Apr 21. Block 30 min today or tomorrow; post approval or specific feedback.
- [REVIEWER] Quick config PRs (< 30 min combined):
- `Re-enable extension rollout for internal users` [privacy-configuration]
- `aiChatNtpRecentChats enabled for internal users` [privacy-configuration]
**Quick Wins Day Targets (AOR)**
- [DRI] `Pixel anomaly report 2026.04.07 (mac)` `gid:1213975525679527` — inbox, no due date; review and triage.
- [DRI] `Consider removing mac_malicious-site-protection_client-timeout` `gid:1210855358441832` — quick_wins; evaluate if removable; low-risk if feature is stable.
- [DRI] `Quick Wins Day Action: Update your AORs` `gid:1214060248301019` — NEW, due Apr 17. Complete AOR update doc.
**Week's TP — setup (deferred from yesterday)**
- [DRI] `Follow-up: add support to restore onboarding state for duck.ai non-experiment flow` `gid:1213992139518104` — still in inbox, no due date. Set due date (Apr 1819 to give buffer before Apr 20 release), move to top_priority.
**Inbox triage (2 items still unresolved)**
- `Confirm defaultValue for popupBlocking migration` `gid:1214004917427136` — still in inbox; needs input or due date.
- `Follow-up: add support of Inline Text Images to TypingTextAnimation` `gid:1214040804696193` — still in inbox; set due date next week, move out.
---
### 🟡 Delegated — Follow Up Needed
**1. ⚠️ MERGED — Close Asana task: PR: Add cohorts to Privacy Config** `gid:1213486302217603`
- GitHub PR #4329 (apple-browsers) merged 2026-04-10 by mallexxx. Asana task still open, stale 35 days, assignee Alessandro.
- Action: Mark Asana task `gid:1213486302217603` complete now — this is a one-click action.
**2. OVERDUE — Alex: Calibration for EP2/3 reviews for Apple engineers** `gid:1213760134490549`
- Christie; due 2026-04-03 (12 days overdue). No status update received.
- Action: Ping Christie directly (see 🔴 Section 1, item 3).
---
### ✨ Morning
Today is Leonardo da Vinci's birthday — born April 15, 1452. He left behind ~13,000 pages of notebooks written in mirror script, covering flying machines, anatomy, optics, and hydraulics. He also had a habit of buying caged birds at markets just to set them free.
💧 Start with a glass of water.
---
### 🔵 Rhythms
**TP**: `Follow-up: add support to restore onboarding state for duck.ai non-experiment flow` `gid:1213992139518104` — this week's designated TP; no due date set yet (**set today**, tied to Apr 20 public release); still in inbox (**move to top_priority**). Not stale — recently designated.
**Next TP**: `iOS: Demo tracker blocking after chat in onboarding` `gid:1213551050320249` (due May 11). Alex commented Apr 14 announcing start shift to Apr 20; Costas confirmed it's on the O-N Critical Path. Next TP Thread open ✅. Kick-off task `gid:1213551072611251` due Apr 21.
**Upcoming this week**:
- `Pinned tab opens link in background tab` `gid:1214038885921128` — due **Fri Apr 17**; triage + fix/scope starts tomorrow (Thu, QWD 2)
- `Quick Wins Day Action: Update your AORs` `gid:1214060248301019` — due **Fri Apr 17**
- `GeolocationProviderTests flakiness` `gid:1213996660793764` — due **Mon Apr 20**; must ship by Fri EOD
- O-L Weekly Meeting — **Mon Apr 20**
- O-N Weekly Meeting **Tue Apr 21** — ⚠️ **CANCELLED** (Gary: "Canceling next week's call as several teams are out for their meetups")
- Apple Weekly Team Meeting — **Tue Apr 21** (Bartek rescheduled from meetup week; IS happening)
- Kick-off: Demo tracker — **Tue Apr 21** (`gid:1213551072611251`)
- No 1:1 this week (Dominik OOO; next 1:1 ~Apr 28)
---
## Priority Order for Today
0. ✨ Morning ritual — 💧 Start with a glass of water.
1. **Investigate new CI crash `gid:1214067738586364`** — Alessandro asked at 02:14, due today; c-s-s integration test crashed after merge into main
2. **CI test flakiness `gid:1213975496167929`** — 6 days overdue, Sam's ask; investigate + respond (QWD target)
3. **Review `[iOS/macOS] Bump C-S-S to 14.0.0`** — new GitHub review request; direct follow-on to yesterday's c-s-s review
4. **Close delegated Asana task `gid:1213486302217603`** — PR merged Apr 10, still open (1-click)
5. **Ping Christie re: calibration `gid:1213760134490549`** — 12 days overdue (2-min ping)
6. **Review Fire Window animation PR `gid:1213760440471324`** — 3+ weeks stalled, Dominik back Apr 21; 30 min
7. **Quick privacy-config PRs** — Re-enable extension rollout + aiChatNtpRecentChats (< 30 min)
8. **Set up duck.ai follow-up TP `gid:1213992139518104`** — set due date (Apr 1819), move to top_priority
9. **Pixel anomaly triage `gid:1213975525679527`** + **flag evaluation `gid:1210855358441832`** — QWD targets
10. **Update your AORs `gid:1214060248301019`** — due Apr 17