[2026-05-15] vault restructure: personal-os plans → personal/projects/personal-os, briefs → work/briefs

This commit is contained in:
Alexey Martemyanov
2026-05-15 14:17:41 +06:00
parent 00f89f49d0
commit 4f4358d76b
72 changed files with 5797 additions and 0 deletions
+105
View File
@@ -0,0 +1,105 @@
Now I have all the context I need. Let me compile the brief.
---
## Daily Brief — 2026-04-14
### 🔴 Urgent / Overdue
**1. OVERDUE [DRI] — PR: content-scope-scripts 🔴 [major] 13.41.0 → 14.0.0** `gid:1214050584863995`
- Context: Major version bump with likely breaking changes; assigned to Alex; due **today**. No activity since Apr 13.
- Action: Review breaking changes — comment approve, reject, or explicitly defer with rationale before EOD today.
**2. OVERDUE [DRI] — PR Check failing on main — testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain** `gid:1213975496167929`
- Context: Due 2026-04-09 (5 days overdue). Sam flagged on Apr 8 as "looks like a flaky runner connection" — no investigation response from Alex yet.
- Action: Check CI runner logs / attempt local reproduction; reply to Sam with findings ("reproducing — investigating fix" or "confirmed flaky — disabling pending fix").
**3. OVERDUE [DELEGATED] — Alex: Calibration for EP2/3 reviews for Apple engineers** `gid:1213760134490549`
- Context: Assigned to Christie; due 2026-04-03 (11 days overdue). No confirmation of submission. Dominik OOO until Apr 21 — can't escalate via 1:1 until Apr 28.
- Action: Ping Christie directly: *"Hey Christie — wanted to check in on the EP2/3 calibration submission — were you able to get that in?"*
> **Backlog cluster** (informational — planning section, no new activity): `Assertion Failure Pixel Anomaly 2025/09/15` (7mo overdue) and `Review Overdue Tasks Summary Jan 2026` (77d overdue). Not urgent today — schedule a 20-min triage pass during Quick Wins week.
---
### 🟠 Needs Action Today
**This Week's TP — Duck.ai Onboarding Follow-up**
- [DRI] `Follow-up: add support to restore onboarding state for duck.ai non-experiment flow` `gid:1213992139518104`
- Context: Created Apr 10 post-SR closure; no due date set; public release Apr 20 creates a hard time dependency. Currently in inbox (not yet moved to top_priority).
- Action: Open task, add scope notes, **set due date (Apr 18 or Apr 19)** to allow buffer before public release. Move to top_priority section.
**PR Review (Reviewer)**
- [REVIEWER] `macOS: Fire Window animation not played when closing window using cmd+w` `gid:1213760440471324`
- Context: Dominik's PR; Alex is assigned reviewer; stalled 3+ weeks (last modified Apr 9). Dominik returns Apr 21 — this needs to land before then.
- Action: Block 30 min today; post approval or specific feedback.
**GitHub — PR Review Queue (10 open)**
- 3 privacy-configuration flag PRs (quick, ~10 min each):
- `Re-enable extension rollout for internal users`
- `aiChatNtpRecentChats enabled for internal users`
- `Enable iPad toggle for iOS 7.211`
- 7 apple-browsers code reviews (deeper, schedule time block):
- `[iOS] Add Pixels definition for Duck.ai Onboarding experiment`
- `[macOS] Improve value transformer failure observability`
- `[macOS] Avoid a force unwrap crash when calling debugDescription`
- `Remove crashCollectionDisableKeysSorting feature flag`
- `[macOS] Sync dock notification and first launch date`
- `[macOS] Enable Promo Queue feature flag`
- `Fix maestro tests`
- Action: Clear the 3 config PRs now (quick wins). Block time for code reviews or batch-defer to Quick Wins Days.
**Inbox Triage (3 items)**
- `Confirm defaultValue for popupBlocking migration` `gid:1214004917427136` — needs Alex's input on migration default; no due date. Triage: respond with value or set due date.
- `Cmd+Shift+R hard refresh page` `gid:1214040804696197` — arrived today at 12:34. Triage: assess scope, set due date, move to appropriate section.
- `Follow-up: add support of Inline Text Images to TypingTextAnimation` `gid:1214040804696193` — second SR follow-up from today. Per weekly plan: set due date for next week, move out of inbox.
---
### 🟡 Delegated — Follow Up Needed
**1. ⚠️ MERGED — Close Asana task: PR: Add cohorts to Privacy Config** `gid:1213486302217603`
- GitHub PR #4329 (apple-browsers) merged 2026-04-10. Asana task still open, stale 35 days, assignee Alessandro.
- Action: Mark Asana task `gid:1213486302217603` complete.
**2. OVERDUE — Alex: Calibration for EP2/3 reviews for Apple engineers** `gid:1213760134490549`
- Assignee: Christie; due 2026-04-03 (11 days overdue). No update received.
- Action: Ping Christie directly (see Section 1, item 3).
---
### ✨ Morning
On April 14, 2003, the Human Genome Project was officially declared complete — 13 years of international collaboration, ~3 billion base pairs mapped. One of the great scientific feats of the modern era, quietly finished on a Tuesday.
🌿 Step outside for 5 minutes before opening Slack.
---
### 🔵 Rhythms
**TP**: `Follow-up: add support to restore onboarding state for duck.ai non-experiment flow` `gid:1213992139518104` — designated this week per weekly plan; no due date set yet (**set today** — tied to Apr 20 public release). Not stale — just started. Currently in inbox; move to top_priority section.
**Next TP**: `iOS: Demo tracker blocking after chat in onboarding` `gid:1213551050320249` (due May 11) queued in top_priority. Current TP not close to completion — Next TP Thread check deferred.
**Upcoming**:
- **Pinned tab bug** `gid:1214038885921128` — due **Fri Apr 17**; triage starts this week (Quick Wins Day 2, Thu)
- **GeolocationProviderTests flakiness** `gid:1213996660793764` — due **Mon Apr 20**; must ship by Fri
- **O-L Weekly Meeting** — moved to **Apr 20** (per Mark's comment)
- **Quick Wins Days** — WedFri (Apr 1517)
- **No 1:1** (Dominik OOO Apr 1320; next ~Apr 28)
- **Dominik returns Apr 21** — Fire Window animation review must be done before then
---
## Priority Order for Today
0. ✨ Morning ritual — 🌿 Step outside for 5 minutes before opening Slack.
1. **Review `PR: content-scope-scripts 🔴 [major]` `gid:1214050584863995`** — approve / reject / defer with comment before EOD (due today)
2. **Scope duck.ai onboarding follow-up `gid:1213992139518104`** — set due date (Apr 1819), add scope notes, move to top_priority
3. **Clear 3 quick privacy-config GitHub PRs** — Re-enable extension rollout, aiChatNtpRecentChats, iPad toggle (~30 min total)
4. **Review Fire Window animation PR `gid:1213760440471324`** — Dominik's, 3+ weeks stalled, 30 min
5. **CI test flakiness `gid:1213975496167929`** — investigate, post response to Sam
6. **Close delegated Asana task `gid:1213486302217603`** — PR merged, task still open
7. **Ping Christie re: EP2/3 calibration `gid:1213760134490549`** — 11 days overdue
8. **Inbox triage** — popupBlocking defaultValue + Cmd+Shift+R + Inline Text Images follow-up (set due dates, move to sections)