[2026-05-30] добавил daily/inbox brief и weekly plan на 2026-06-01

This commit is contained in:
Alexey Martemyanov
2026-05-30 11:03:04 +06:00
parent d149c39de1
commit 40f4a6b839
3 changed files with 148 additions and 0 deletions
+94
View File
@@ -0,0 +1,94 @@
---
## Daily Brief — 2026-05-30 (Saturday)
### ✨ Morning
On this day in 1971, NASA launched Mariner 9 — it became the first spacecraft ever to orbit another planet (Mars), beating two Soviet probes there by a few weeks. Quiet hero of the space age.
🚶 It's the weekend — take a short walk before opening anything work-related.
**Today's anchor**: Weekly plan calls for a light Saturday — process inbox, reply to Ivy on Windows AOT plan. New signals since the last sync: 4 new comments on TP work (Alessandro raised a Treatment B experiment blocker; Costas closed the back-button subtask and floated an iPad-specific project). No yesterday's brief on disk to diff against.
## Plan for Today
1. ⚡ **5-min momentum starter** — [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) (anonymous, 5-minute timebox, overdue since 5/26). Knock it out first.
2. 🔴 **Respond to Alessandro on Treatment B blocker** — [Ship AI onboarding winner](https://app.asana.com/0/0/1215009192158955). His 5/29 comment says shipping Treatment B mid tracker-blocker-demo experiment would compromise data. Pick option 1 (ride out to min sample, then flip via remote config) vs option 2, or punt the decision to Mon. Quick async reply now unblocks Monday.
3. 💬 **Reply to Ivy on Windows AOT plan** — per weekly plan Must-Not-Forget (no Asana task gid surfaced in snapshot; check Slack/email).
4. 📥 **Process inbox** — quick triage pass. Note Costas's iPad-specific project idea for the O-N weekly Wed 6/03 (already in your Wed plan).
5. _(Optional)_ Merge [Hide Free plan PR #5149](https://app.asana.com/0/0/1215009192158952) — CI ✅ and review ✅. Plan has this for Mon but it's a one-click if you're already at the keyboard.
Light Saturday — don't push past these. Sun is a rest day; set Monday's 1-Must in the evening.
---
### 🔴 Urgent / Overdue
- [top_priority] [DRI] — **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** (due 5/28, +2d)
- Context: Alessandro flagged 5/29 that releasing Treatment B mid-experiment compromises tracker-blocker-demo data. Two options proposed.
- Action: Reply with a decision (or "decide Mon after Persist PR lands"). You're the current blocker.
- [inbox] [Quick] — **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** (due 5/26, +4d)
- Context: Anonymous, 5-minute timebox.
- Action: Just do it — momentum starter (#1 in plan).
- [inbox] [AOR] — **[PR: Monterrey-only macOS app](https://app.asana.com/0/0/1215150214975916)** (due 5/27, +3d)
- Context: Must-Not-Forget. Weekly plan has this for Tue 6/02.
- Action: Hold for Tuesday — not a Saturday task.
- [inbox] [Follow-up] — **[Inline Text Images → TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** (due 5/28, +2d)
- Context: Must-Not-Forget follow-up. Draft PR #4663 is up.
- Action: Hold for next week; not urgent today.
- [top_priority] [DRI] — **[Hide stop chat button](https://app.asana.com/0/0/1215009192158954)** (due 5/29, +1d)
- Context: PR #5173 up, CI ✅, waiting for review. Alex is **not** the blocker.
- Action: Monitor for reviewer ping. No action today.
**Backlog cluster** (inbox/planning/active items stale ≥4 weeks — informational, not action items): Tab preview stuck (Apr 2025), Duo Grafana login (Jul 2025), Assertion Failure Pixel Anomaly (Sep 2025), Review Overdue Tasks Summary (Jan 2026), PR Check failing testWhen…ReloadFails (Apr 2026), Pinned tab opens link in background (May 1), Text selection in address bar (May 1), PR Check failing on main (May 15). Sweep when you have an inbox-grooming hour — not today.
---
### 🟠 Needs Action Today
**Ship Reviews (DRI)** — None today.
- Ship Review subtask [1215009192158961](https://app.asana.com/0/0/1215009192158961) is delegated but not yet open. Per weekly plan, opens Mon after Persist dialogue PR lands. No action Saturday.
**Tech Designs** — None active.
**PR Reviews****11 review requests / mentions queued on GitHub** (full list in `asana_context.md`: 6 review-requested, 5 mentions, across privacy-configuration and apple-browsers). Batch on Monday after TP block. None is overdue >5d to Alex specifically, so no individual surfacing today.
**PFRs** — None.
**Incidents** — None open. Discord/AI-Agent postmortem closed 5/28 ✅.
---
### 🟡 Delegated — Follow Up Needed
- **[Privacy Triage: Apple — iOS Demo tracker blocking](https://app.asana.com/0/0/1214965405681675)** (Jake Abel, due 5/21, **+9d overdue**)
- Suggested nudge: "Hey Jake — any blockers on the privacy triage? Need it for the Ship Review opening next week."
- **[Localization — 2-5 days](https://app.asana.com/0/0/1214147157456477)** (unassigned, due 4/28, **+32d overdue**)
- Action: Either assign a DRI or move to backlog. Has no owner.
- **[Login autofill shows empty field in macOS Browser](https://app.asana.com/0/0/1211742725064177)** (Deepankar, due 2025-11-17, **stale 6+ months**)
- Action: Probably close or re-scope; no activity since 2025-12-08.
- **[assertionFailure when DBP url is opened](https://app.asana.com/0/0/1212305913722018)** (Anh Do, due 2025-12-12, **stale 5+ months**)
- Action: Same — close or re-scope.
GitHub delegated PR correlation: 1 row with no GitHub match (74-day stale), no merged-but-not-closed tasks. Clean.
---
### 🔵 Rhythms
**TP**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — due Fri 6/05. Last modified 5/29. ✅ Active, not stale.
Next TP Thread check: TP is **not yet close to completion** (Ship Review not opened, Persist dialogue PR not merged, Treatment B blocked). Skip Next TP Thread for now.
**Upcoming this week** (next week, since today is Sat):
- **Mon 6/01**: O-L Weekly Meeting; finish Persist dialogue PR; open Ship Review; merge Hide Free plan PR.
- **Tue 6/02**: Apple Weekly; Monterrey-only PR.
- **Wed 6/03**: O-N Weekly — raise iPad-specific project idea per Costas's 5/29 comment.
- **1:1 with Dominik**: SKIPPED — Dominik OOO 6/016/05 (LDX3 + holiday). Next window 6/08, partly conflicts with your WWDC AFK 6/086/12.
- **AFK heads-up**: Your WWDC partly-AFK window starts in 9 days (6/086/12).
---