Failed to authenticate. API Error: 401 Invalid authentication credentials
[2026-05-18] vault sync
This commit is contained in:
@@ -0,0 +1,105 @@
|
||||
---
|
||||
## Daily Brief — 2026-05-18
|
||||
|
||||
### ✨ Morning
|
||||
On this day in 1969, Apollo 10 launched — the "dress rehearsal" mission that flew to the Moon and back without landing, coming within 15km of the lunar surface. The crew named the lunar module "Snoopy" and the command module "Charlie Brown." 🚀🐾
|
||||
💧 Start with a glass of water.
|
||||
|
||||
---
|
||||
|
||||
## Plan for Today
|
||||
|
||||
1. ⚡ Close old 1:1 Agenda task — [Dominik :: Alex Regular 1:1 Agenda (May 5)](https://app.asana.com/0/0/1214339792109087) is overdue; mark complete or archive it (≤5 min)
|
||||
2. 🔴 Ship Review: Demo tracker blocking — review Alessandro's update from this morning and confirm merge readiness; Costas gave green light Friday even before Design Review sign-off
|
||||
3. 🔴 PR Check failing on main — [task](https://app.asana.com/0/0/1214797526093576) updated today; check CI status and unblock if needed
|
||||
4. Review remaining open inbox items from onboarding ship: GJ7, GJ8, animated assets — port unfinished tasks to follow-up project per Costas's instruction
|
||||
5. 1:1 with Dominik tomorrow — prep agenda in [upcoming task](https://app.asana.com/0/0/1214742648120931)
|
||||
|
||||
---
|
||||
|
||||
### 🔴 Urgent / Overdue
|
||||
|
||||
**⚠️ Ship Review: iOS: Demo tracker blocking after chat in onboarding — 2-5 days**
|
||||
- [Ship Review task](https://app.asana.com/0/0/1214147157456478) — due 2026-05-15, still open
|
||||
- [Main feature task](https://app.asana.com/0/0/1213551050320249) — due today (2026-05-18)
|
||||
- **Latest signal (this morning):** Alessandro commented at 06:01 — running another round of tests today, will share an update.
|
||||
- **Costas's green light (May 17):** Even without Design Review marked approved, Costas said: if 3 tasks are wrapped and QA passed → merge. Port remaining open tasks to follow-up project.
|
||||
- **Status:** Multiple PRs merged into feature branches (#4591, #4664, #4855) but not into main yet. Still needs final QA pass from Alessandro.
|
||||
- **Action:** Check Alessandro's test update when it comes in. If QA passes → merge and close Ship Review.
|
||||
|
||||
**⚠️ PR Check is failing on main**
|
||||
- [Task](https://app.asana.com/0/0/1214797526093576) — due 2026-05-15, updated this morning (04:21)
|
||||
- Auto-comment: task is overdue, validate assignee/due date
|
||||
- **Action:** Check which test is failing on main (`testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain_errorPageIsShownOnce` was the last known offender). Disable or fix.
|
||||
|
||||
**⚠️ Dominik :: Alex Regular 1:1 Agenda (May 5)**
|
||||
- [Task](https://app.asana.com/0/0/1214339792109087) — overdue since May 5
|
||||
- **Action:** Mark complete (meeting has passed).
|
||||
|
||||
**⚠️ Assertion Failure Pixel Anomaly (2025-09-15)**
|
||||
- Planning section — date 2025-09-17, no recent activity
|
||||
- **Backlog note** — no action today; see Backlog cluster below.
|
||||
|
||||
**Backlog cluster (no action today):**
|
||||
- "Bug: Tab preview stuck around" (2025-04-15, inbox — macOS Browser Bugs)
|
||||
- "Duo login to Grafana" (2025-07-23, inbox — Internal Support Inbox)
|
||||
- "Review Overdue Tasks Summary" (2026-01-27, planning)
|
||||
- Planning items: Error page icon, Cmd+Shift+R, Back-to-close tab, Downloads bug batch, etc.
|
||||
- Do-later / quick_wins with stale dates: Singletons proposal, warnBeforeQuit flag, etc.
|
||||
|
||||
---
|
||||
|
||||
### 🟠 Needs Action Today
|
||||
|
||||
**Ship Reviews (DRI)**
|
||||
- **Ship Review: Demo tracker blocking** — see Urgent above. Alessandro is running tests today. If QA passes, Costas authorized merging before Design Review is formally ticked off. Port unfinished GJ items to follow-up project ([iOS Address onboarding conflicts...](https://app.asana.com/0/0/1214592943696234)).
|
||||
- **Ship Review: (iOS Only) Ensure compatibility on iPad** — [task](https://app.asana.com/0/0/1214396826612252) in inbox, no due date; no recent activity. Monitor — no action required today unless pinged.
|
||||
|
||||
**Onboarding inbox items (from the Demo tracker SR):**
|
||||
Several tasks from the onboarding rework remain open in inbox:
|
||||
- [Address Bar Toggle Selection: Animated Assets](https://app.asana.com/0/0/1214627423981798) — GJ1/ asset; agreed to port to follow-up if not done in time
|
||||
- [Address Bar Toggle Selection: Revert Copy](https://app.asana.com/0/0/1214828145455319) — due 2026-05-15
|
||||
- [GJ7/ Fix address bar focus dismissing search suggestion dialog](https://app.asana.com/0/0/1214682678629766) — due 2026-05-15
|
||||
- [GJ8/ Change "Duck.ai" to "Ask AI" on toggle selection screen](https://app.asana.com/0/0/1214683268207886) — due 2026-05-15
|
||||
- [Try Visiting a Site: Remove Browser Toolbar](https://app.asana.com/0/0/1214828145455337) — due 2026-05-15
|
||||
- [You've Got This!: Remove pointer](https://app.asana.com/0/0/1214828145455345) — due 2026-05-15
|
||||
- [Try a Search or AI chat: Remove pointer](https://app.asana.com/0/0/1214846580751519) — due 2026-05-15
|
||||
- [Try Visiting a Site: Background](https://app.asana.com/0/0/1214828145455342) — due 2026-05-15
|
||||
- **Action:** Port any not yet completed → follow-up project per Costas. Confirm which are done vs. still outstanding.
|
||||
|
||||
**PR Check is failing on main** — see Urgent above.
|
||||
|
||||
**Tech / Other**
|
||||
- [DRI ↔ Project Advisor async for Demo tracker...](https://app.asana.com/0/0/1213551072611261) — macOS Release Board, no due date. Review if still relevant after merge.
|
||||
- [macOS App Maintenance](https://app.asana.com/0/0/1214837564647979) — due 2026-05-22, inbox. Low urgency.
|
||||
|
||||
---
|
||||
|
||||
### 🟡 Delegated — Follow Up Needed
|
||||
|
||||
| Task | Assignee | Due | Status |
|
||||
|------|---------|-----|--------|
|
||||
| [Login autofill shows empty field in macOS Browser](https://app.asana.com/0/0/1211742725064177) | Deepankar Bajpeyi | 2025-11-17 | **Overdue** — last touched Dec 2025 |
|
||||
| [assertionFailure when DBP url is opened](https://app.asana.com/0/0/1212305913722018) | Anh Do | 2025-12-12 | **Overdue** — last touched Dec 2025 |
|
||||
| [Subfeature settings converted to&from String](https://app.asana.com/0/0/1212016050823964) | Sabrina | — | **Stale** — last activity Jan 2026 |
|
||||
| [Document font usage standards](https://app.asana.com/0/0/1206389088453914) | Stephen (Design) | — | **Stale** — last activity Apr 2026 |
|
||||
|
||||
> **Suggested action:** Deepankar and Anh Do tasks are ancient overdue — ping or close if no longer relevant. Sabrina's subfeature task also stale.
|
||||
|
||||
---
|
||||
|
||||
### 🔵 Rhythms
|
||||
|
||||
**TP:** [iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) — due today. Active, near-merge. Ship Review resolution is the final gate. Not stale — actively driven this week.
|
||||
|
||||
**Next TP:** [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — due 2026-06-02. No Next TP Thread visible in DB comments yet. → **Add to today's list: open Next TP Thread on this task once current TP ships.**
|
||||
|
||||
**Upcoming:**
|
||||
- **1:1 with Dominik** — tomorrow (May 19). [Agenda task](https://app.asana.com/0/0/1214742648120931) ready; prep agenda today.
|
||||
- **macOS App Maintenance** — due 2026-05-22 (Friday). Light lift; block 30 min later this week.
|
||||
- **macOS - Add Pixels: Downloads** — due 2026-05-22. Observability task; check if it needs scheduling.
|
||||
- **[ON HOLD] iOS: New toggle screen** — due 2026-05-15 (Staffing, top_priority). Likely superseded by the Demo tracker project outcome — verify if still needed.
|
||||
|
||||
---
|
||||
|
||||
*Data freshness: my_tasks synced 07:05 local. Project streams synced 07:05 local. asana_context.md generated 01:05 UTC (stale >6h — brief derived from direct DB queries).*
|
||||
Reference in New Issue
Block a user