sync xgimi play 6 how-to
This commit is contained in:
@@ -1,4 +1,4 @@
|
||||
## Inbox Triage — 2026-05-24 (since 2026-05-24 13:10)
|
||||
## Inbox Triage — 2026-05-24 (since 2026-05-24 14:16)
|
||||
|
||||
### New / Changed — Action Required
|
||||
_None._
|
||||
@@ -9,14 +9,15 @@ _None._
|
||||
### Nothing new
|
||||
Inbox quiet — nothing new.
|
||||
|
||||
**Window scanned:** 2026-05-24 13:10 → now (~12:00 Almaty, Sunday).
|
||||
**Window scanned:** 2026-05-24 14:16 → now (14:50 Almaty / 08:50 UTC, Sunday). 34-minute window since previous triage.
|
||||
|
||||
**Sources checked:**
|
||||
- Snapshot `asana_context.md` (generated 2026-05-24 07:41 UTC) — "Recent Comments on My Tasks (24h)" contains only 1 entry (automated bot reminder at 06:14 UTC on "Alex M next Top Priority (May/25)") — excluded per STEP 0b as automated/bot event, and predates SINCE.
|
||||
- "Changed in Last 24h" — all 7 entries pre-date SINCE (latest: 06:14 UTC).
|
||||
- Local Postgres @mention query (STEP 1b) unavailable on this host (no `psql`/`/etc/ddg/dbenv`); relied on snapshot signals only.
|
||||
- Sync freshness: `my_tasks`, `delegated`, `following`, and projects all last synced at 2026-05-24 07:41 UTC. No incremental sync has run between SINCE and now, so any activity in that window has not yet been captured locally.
|
||||
- Snapshot `asana_context.md` (generated 2026-05-24 08:46 UTC) — most recent human activity in "Recent Comments (24h)" is the automated bot at 06:14 UTC on *Alex M next Top Priority (May/25)*; pre-SINCE and bot-generated (excluded per STEP 0b).
|
||||
- "Changed in Last 24h" — all 4 entries pre-date SINCE.
|
||||
- Delegated tasks — latest human modification May 23 05:08 UTC; pre-SINCE.
|
||||
- Postgres direct queries (STEP 1b @mentions, plus broader stories + tasks scans since SINCE) — **0 rows** in both Almaty (+06) and UTC interpretations of the cutoff. DB latest story timestamp is 2026-05-24 13:49+06 (= 07:49 UTC), before SINCE.
|
||||
- No new Ship Review / Tech Design / incident / rotation state changes.
|
||||
|
||||
**Excluded per STEP 0b** (belong in daily-brief, not inbox): overdue tasks in 🔴 Signals, the PR review backlog (7 review requests + 5 mentions), and the "Comments awaiting reply" list (May 17–23 — all pre-SINCE).
|
||||
**Excluded per STEP 0b** (belong in daily-brief, not inbox): overdue tasks in 🔴 Signals, PR review backlog (7 review requests + 5 mentions in GitHub Needs Attention), and the "Comments awaiting reply" list — all entries pre-date SINCE, and the FEEDBACK_BOT comments are automated.
|
||||
|
||||
**Gating (STEP 0a):** Not Dominik 1:1 (Sunday). Apple Weekly is May 26, not today. Activity shows "no recent activity" — no deep-focus skip. Proceeded.
|
||||
**Gating (STEP 0a):** Not Dominik 1:1 (Sunday, not Tuesday 15:00). Apple Weekly is May 26, not today (DB confirmed). MS365 calendar live-check unavailable (lethal-trifecta gate launcher failed) — skipped per STEP 0a #3 fallback. Current app per status.md is DuckDuckGo browser (not Xcode/Cursor/Code/Terminal) — no deep-focus skip. Proceeded.
|
||||
|
||||
Reference in New Issue
Block a user